background image

3. LUBRICATION 

CAUTION

 

(1) Please make sure to turn power switch off before lubricating. 

(2) Please pay attention that oil does not get on your skin or in your eyes as it may cause an inflammation. 

(3) Please make sure to keep oil out of the reach of children who may drink oil by mistake. 

[Notice] Please make sure to lubricate when operating for the first time after the installation. Also, please 

make sure to check the amount of oil when the machine has not been used for a long time. 

 

3-1. Filling the oil tank 

Pour the oil through the oil hole (No.1 and 3) to the oil tank (No.2 and 4) on the machine arm. Pour 

the oil hole (No.5) to the oil tank (No.6) on the machine bed. Please fill with the oil over level mark 

(No.7) of the oil tank. 

3-2. Oiling 

Put some oil to the red marked oil holes (No.8 ~ 11). 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
4. Initial setting of the control box 

When using the sewing machine for the first time, the model and the language of the sewing machine in 

use have to be set. 

Refer to the instructions in the paragraph “[6] Initial Setting of System (Model/language Setting)” in the 

CONTROL UNIT technical manual. 

 

 

<2> 

<7> 

<6> 

<5> 

<4> 

<3> 

<1> 

<8> 

<9> 

<10> 

<11> 

- 5 - 

Summary of Contents for PLK-G10050

Page 1: ...INDUSTRIAL SEWING MACHINE MODEL PLK G5050 PLK G10050 TECHNICAL MANUAL SEWING MACHINE HEAD BASIC A180E684P02 ...

Page 2: ...to a serious consequence according to the circumstances Always follow the instructions of both levels because they are important to personal safety CAUTION INDICATIONS No Caution indication Description 1 Precaution for sewing machine operation Indicates that removing the safety and operating the sewing machine for some other purposes with power on are prohibited Please do not operate the sewing ma...

Page 3: ... corrosive gas 7 In the place where the fluctuation in the power voltage of 10 or more than 10 or the power voltage of 10 or less than 10 of the fixed power voltage 8 In the place where the power source cannot supply enough voltage to keep the motor running 9 In the place filled with strong electric noises such as high frequency welders INSTALLATION 1 Please have some specialists who have enough e...

Page 4: ...ouch the operating parts during sewing operation 9 It is very dangerous to operate the sewing machine without safety guards eye guards belt covers link covers finger guards or the others Please make sure to operate the sewing machine with safety guards 10 Please make sure to turn the power switch off when stopping the sewing machine temporarily ADJUSTMENT 1 Please make sure to turn the power switc...

Page 5: ...allation of the foot switch 2 2 Connection of the air tube 2 3 Installation of the thread stand 2 4 Installation of the eye guard 2 5 Installation of the spindle motor 2 2 3 3 4 3 LUBRICATION 5 3 1 Filling the oil tank 3 2 Oiling 5 5 4 Initial setting of the control box 5 ...

Page 6: ...050 electronic pattern sewing machine consists of the following main parts 1 Sewing machine head 2 Main shaft motor 3 Halt switch 4 Control box 5 Operation panel 6 Work holder foot switch 7 Start foot switch 8 Thread stand 9 Table 10 Power switch 1 ...

Page 7: ...ed in the accessory box 2 2 Connection of the air tube Insert the one end of the air tube 8mm Diameter into the intake air fitting of the filter regulator No 1 then join the other end of the air tube with the suitable air coupling to be adopted with the air supply source provided in your factory One of the air couplings No 2 is enclosed in the accessory box 1 Intake air fitting 2 Air coupling 1 2 ...

Page 8: ...screws No 2 on the eye guard unit No 1 then mount the SW PW screws No 3 to the flat place of the sewing machine with the open guard 2 Return the open guard to the initial position then tighten the SW MW screws No 2 1 Eye guard unit 2 SW MW screw 3 SW PW Screw 2 1 Upper column pipe 2 Lower column pipe 3 Spool stand base 2 4 Spool mat 2 5 Spool holder 2 6 Spool shaft 2 7 Spring washer 2 8 Nut 4 9 Th...

Page 9: ...n the below described position when reinstalling the coupling to the machine top shaft Make sure the clearance of the coupling is from 2 0 to 3 2mm 4 Turn the pulley No 8 in the direction of the arrow then slip the gauge No 5 in between the needle bar and the needle plate Use the part of S side 50 1mm on the gauge 5 Be careful not to make the motor turn and fit the coupling to the upper shaft and ...

Page 10: ... not been used for a long time 3 1 Filling the oil tank Pour the oil through the oil hole No 1 and 3 to the oil tank No 2 and 4 on the machine arm Pour the oil hole No 5 to the oil tank No 6 on the machine bed Please fill with the oil over level mark No 7 of the oil tank 3 2 Oiling Put some oil to the red marked oil holes No 8 11 4 Initial setting of the control box When using the sewing machine f...

Page 11: ...MEMO ...

Page 12: ...Printed in Japan ...

Reviews: