[4]
‐
1
[4] Names of each part, wiring and grounding
1.Front side
2.Back side
CON F Power supply
(Connect to power switch box)
CON G Operation panel
CON M Main servo encoder
(Connect to spindle servo motor)
CON J I/F board signal
(
Connect to I/F board (MIF)
)
CON P XY axis encoder
(Connect to XY axis stepping motor)
CON Q PF axis encoder
(Connect to PF axis stepping motor)
CON L Foot switch
Heat sink
Power
LED (green)
Warning
LED (red)
Front panel
Cover installation screw
(M4 screw)
Cover
CON A I/F board power
“Connect to I/F board (MIF)
“
CON B Main servo motor
(Connect to spindle servo motor)
CON H general purpose port
(
Connect to PC
)
CON K universal serial communication port
CON D XY axis stepping motor
(Connect to sewing machine head stepping
motor)
CON E PF axis stepping motor
(Connect to sewing machine head PF axis
stepping motor)
Rating plate
Caution: Be sure to connect all connectors before turning ON the power. Connect each connector fully to ensure
sufficient contact. Refer to
“section [13].”
Summary of Contents for PLK-J-CU-20S
Page 1: ...INDUSTRIAL SEWING MACHINE MODEL PLK J CU 20S TECHNICAL MANUAL Control Unit A180E816P01 ...
Page 38: ... 12 Several power supply 1 3Ø AC200V 240V 50 60Hz 2 1Ø AC200V 240V 50 60Hz Except Europe 12 1 ...
Page 39: ...3 3Ø AC380V 415V 50 60Hz Except Europe 4 1Ø AC200V 240V 50 60Hz Europe 12 2 ...
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ...Printed in Japan ...