- 19 -
(4) After removing the face cover, turn the hand pulley (No.4) and stop it to the position where the needle
bar upper position. In this state, the crank rod of needle bar (No.9) becomes vertical.
(5) Confirm the clearance between main shaft detector (No.1) and detector plate (No.2) is in the range of 1 to
1.5 mm. If it is not correct, loosen the detector attaching screw (No.7) and adjust the clearance.
(6) Keep the needle bar position upper and move only the detector plate (No.2) little by little in the
direction of arrow from the state of <A> as showing in below drawing. Stop the detector plate (No.2)
and tighten the screw (No.3) at the position where the detection lamp lighted which has m
ain shaft
detector (No.1). In this state, the detector plate (No.2) is in the state of <B>.
(7) After adjustment, attach the detector cover and continue the adjustment according to the next
paragraph [6-2-3. Adjustment of the timing between the hook and the needle motion].
<9>
<8>
<8>: Needle bar
<9>: Crank rod of needle bar
View a
<A>
<B>
No detecting
(Lamp off)
Detecting
(Lamp lighting)
From the library of Superior Sewing Machine & Supply LLC - www.supsew.com
Summary of Contents for PLK-J4040RH
Page 1: ...INDUSTRIAL SEWING MACHINE MODEL PLK J4040RH TECHNICAL MANUAL SEWING MACHINE HEAD A180E823P02 ...
Page 56: ...From the library of Superior Sewing Machine Supply LLC www supsew com ...
Page 57: ...From the library of Superior Sewing Machine Supply LLC www supsew com ...
Page 58: ...MEMO From the library of Superior Sewing Machine Supply LLC www supsew com ...
Page 59: ...MEMO From the library of Superior Sewing Machine Supply LLC www supsew com ...
Page 60: ...Printed in Japan From the library of Superior Sewing Machine Supply LLC www supsew com ...