35
Specifications are subject to change without notice.
© 2017 Mitsubishi Electric US, Inc.
4. Voltage test points on the control board
1. PVFY-P12, 18, 24, 30, 36, 48, 54NAMU-E1
CND
F01
CNEC1
CNEC2
F
M
N
C
1
A
X
N
C
1
C
X
N
C
1
B
X
N
C
PC51
(*1)
C25
(*1)
C53
(*1)
CN3A
CN2M
SW4
CN24-1
CN24-2
CN32
Indoor controller board
SW3
CN41
CN51
CN52
CN20
CN22
CN7V
CN4F
CN44
SWE
SW2
F01
Fuse (AC 250V 6.3A)
CND
Power supply voltage (220 - 240VAC)
CN2M
For M-NET transmission cable
connection (24 - 30VDC)
SWE
Emergency operation
SW2
Capacity setting
SW4
Function setting
SW3
Function setting
CN32
Remote start/stop adapter
CN3A
For MA remote controller cable
connection
(10 - 13 VDC (Between 1 and 3.))
CN52
Remote display
CN51
Centralized control
CN41
JAMA standard HA terminal A
CN44
Thermistor (liquid/gas temperature)
CN4F
Float sensor
CN22
For fan control
CN24-1
For 1st heater control
CN24-2
For 2nd heater control
CN20
Thermistor (Inlet temperature)
CNMF
Fan motor output
1 - 4: 294 - 340 VDC
5 - 4: 15 VDC
6 - 4: 0 - 6.5 VDC
7 - 4: Stop 0 or 15 VDC
Run 7.5 VDC
(0 - 15 pulse)
CN7V
Connect to the indoor power board
CNEC1
Connect to the indoor controller board
CNEC2
FAN OUT
(*1)
VFG
Voltage on the (-) side of PC51 and C25
(Same with the voltage between 7 (+)
and 4 (-) of CNMF)
VCC
Voltage between the C25 pins
15 VDC
(Same with the voltage between 5 (+)
and 4 (-) of CNMF)
Vsp
Voltage between the C53 pins
0VDC (with the fan stopped)
1 - 6.5VDC (with the fan in operation)
(Same with the voltage between 6 (+)
and 4 (-) of CNMF)
Summary of Contents for PVFY-P12 NAMU-E
Page 2: ......