2-12
Installation
2Unpacking to Installation
8) The installation surface must have sufficient strength to withstand the arm reaction during moving the robot
at high speed.
Table 2-2 : Strength of the installation side (reference)
Please secure the maintenance space required for connection of the machine cable and
exchange the backup battery in the rear side, and also space for J1 axis belt in the right
side. And don't install the robot arm in the position where direct rays or the heat of
lighting hits. The skin temperature of the robot arm may rise, and the error may occur.
Item
Unit
Value
RV-4F series
RV-7F series
RV-7FLL
RV-13F series
RV-20F
Falling moment : M
L
N m
410
900
2,060
Twist moment : M
T
N m
400
900
2,060
Horizontal translation power : F
H
N
700
1,000
1,750
Vertical translation power : F
V
N
1,200
1,700
2,900
CAUTION