6. To remove the control box
(1) Remove the lid of control box.(See No.1)
(2) Pull off all the inserted connectors.
(3) Remove 2 cotrol box fixing screws and remove it.
7. To remove the heat exchanger assembly
(1) Remove the bottom panel(B).(See No.3)
(2) Remove the drain pan.(See No.5)
(3) Remove the control box.(See No.6)
(4) Remove 4 pipe lid fixing screws and remove it.(
mark)
(5) Remove 4 heat exchanger assy fixing screws and
remove it.(
mark)
8. To remove the drain pump(DM) and flot switch(FS)
(1) Remove the control box.(See No.6)
(2) Disconnect the drain pump connector(CNR)
on PCB in control box.
(3) Disconnect the flot switch connector(CNI)
on PCB in control box.
(4) Remove 4 drain pump assembly fixing screws
and remove it.(
mark)
(5) Pull a hose to the arrow direction and remove it.
(6) Remove 3 drain pump fixing screws and
remove it.(
mark)
(7) Remove the flot switch fixing screw and
remove it.(
mark)
9. To remove the electronic expansion Valve (EEV)
(1) Remove the heat exchanger assembly.
(See No.7)
(2) Remove the coil of EEV by pull out
on the top.
(3) Remove welded part of EEV by welding.
(
mark)
10. To remove the thermistors (example"Thi-R1")
(1) Remove the lid of control box.(See No.1)
(2) Disconnect the Thi-R1 connector(CNN) on PWB in control box.
(3) Remove the drain pan.(See No.5)
(4) Pull out the thermistor"Thi-R3" from the sensor holder.
PROCEDURE & PICTURES
Pipe lid
EEV
Coil of EEV
General view
'17 • KX-SM-272
–
1
4
8
–
#
Summary of Contents for 140KXZEN1
Page 153: ... 17 KX SM 272 151 ...
Page 154: ... 17 KX SM 272 152 ...
Page 155: ... 17 KX SM 272 153 ...
Page 156: ... 17 KX SM 272 154 ...
Page 165: ... 163 MEMO 17 KX SM 272 ...