7. To remove the heat exchanger assembly
(1) Remove the drain pan.(See No.4)
(2) Remove 4 heat exchanger assy fixing screws and remove it.(
mark)
8. To remove the impeller and motor (FM)
(1) Remove control box.(See No.1)
(2) Disconnect the motor connector(CNM) on PCB in control box.
(3) Remove the heat exchanger assembly.(See No.7)
(4) Remove the impeller fixing nut and remove it.(
mark)
(5) Remove 4 motor fixing bolts and remove it.(
mark)
(6) Take off the hooks of cover and remove it.
9. To remove the thermistors (example"Thi-R1")
(1) Remove control box.(See No.1)
(2) Disconnect the Tho-R1 connector(CNN) on PCB in control box.
(3) Pull out the thermistor"Thi-R1" from the sensor holder.
10. To remove the Electronic Expansion Valve (EEV)
(1) Remove the heat exchanger assembly.(See No.7)
(2) Remove the coil of EEV by pull out on the top.
(3) Remove welded part of EEV by welding.(
mark)
PROCEDURE & PICTURES
UFM
DAM
Cover
EEV
Coil of EEV
General view
'17 • KX-SM-272
–
1
5
8
–
#
Summary of Contents for 140KXZEN1
Page 153: ... 17 KX SM 272 151 ...
Page 154: ... 17 KX SM 272 152 ...
Page 155: ... 17 KX SM 272 153 ...
Page 156: ... 17 KX SM 272 154 ...
Page 165: ... 163 MEMO 17 KX SM 272 ...