'14 • KX-SM-200
–
114
–
Fig.2 Voltage Measurement Point
※
1
:
Reuse the parts used before the PCB exchange.
※
2
:
Because spare PCB is commonized, by the model, extra connectors is implemented, compared with the former PCB.
When connecting the connectors after exchanging the PCB, check the color and name of the connectors, please note
.
After elapsing 3 minutes
from power OFF
Connectors are not
half inserted
Control PCB voltage measurement point (F1 - DS1(-))
the faulty connections.
Target PCB
Summary of Contents for FDC1000KXZWE1
Page 171: ... 14 KX SM 200 169 ...
Page 172: ... 14 KX SM 200 170 ...
Page 173: ... 14 KX SM 200 171 ...
Page 174: ... 14 KX SM 200 172 ...