'19 • PAC-SM-309
-
179
-
7. To remove the drain pump(DM) and flot switch(FS)
(1) Remove the lid of control box.(See No.1)
(2) Remove 5 drain pump assembly fixing screws and remove it.
( mark)
(3) Disconnect the drain pump connector(CNR) on PCB in control box.
(4) Pull a hose to the arrow direction and remove it.
(5) Remove 3 drain pump fixing screws and remove it.( mark)
(6) Disconnect the flot switch connector(CNI) on PCB in control box.
(7) Remove the flot switch fixing screw and remove it.( mark)
8. To remove the heat exchanger assembly
(1) Remove the bottom panel(B).(See No.3)
(2) Remove 22 bottom panel(F) fixing screws and remove it.( mark)
(3) Remove 2 drain pan fixing screws and remove it.( mark)
(4) Remove 4 heat exchanger assy fixing screws and remove it.( mark)
9. To remove the Electronic Expansion Valve (EEV)
(1) Remove the heat exchanger assembly.(See No.8)
(2) Remove the coil of EEV by pull out on the top.
(3) Remove welded part of EEV by welding.( mark)
10. To remove the thermistors (example"Thi-R3")
(1) Remove the lid of control box.(See No.1)
(2) Disconnect the Thi-R3 connector(CNN) on PWB in control box.
(3) Remove the drain pan.(See No.8)
(4) Pull out the thermistor"Thi-R3" from the sensor holder.
PROCEDURE & PICTURES
PJG012D019
EEV
Coil of EEV
General view
2
Drain pan
Bottom panel(F)
Summary of Contents for FDC100VNA-W
Page 70: ... 19 PAC SM 309 69 LED2 Red LED1 Green ...
Page 72: ... 19 PAC SM 309 71 ...
Page 74: ... 19 PAC SM 309 73 LED2 Red LED1 Green ...
Page 76: ... 19 PAC SM 309 75 ...
Page 183: ... 19 PAC SM 309 182 1 e SRK series PHA012D402 ...
Page 184: ... 19 PAC SM 309 183 Screw ...
Page 185: ... 19 PAC SM 309 184 3 PHA012D402 ...
Page 186: ... 19 PAC SM 309 185 4 PHA012D402 ...