211
-
(g)
Duct connected-Low/Middle static pressure type (FDUM)
(i)
Selection of installation location
1) Avoid installation and use at those places listed below.
a) Places exposed to oil splashes or steam (e.g. kitchens and machine plants).
Installation and use at such places will incur deteriorations in the performance or corrosion with the heat exchanger or
damage in molded synthetic resin parts.
b) Places where corrosive gas (such as sulfurous acid gas) or inflammable gas (thinner, gasoline, etc.) is gnerated or
remains. Installation and use at such places will cause corrosion in the heat exchanger and damage in molded synthetic
resin parts.
c) Places adjacent to equipment generating electromagnetic waves or high-frequency waves such as in hospitals. Gener-
ated noise may cause malfunctioning of the controller.
2) Select places for installation satisfying the following conditions and, at the same time, obtain the consent on the part of
your client user,.
a) Places where chilled or heated air circulates freely. When the installation height exceeds 3m, warmed air stays close to
the ceiling. In such cases, suggest your client users to install air circulators.
b) Places where perfect drainage can be prepared and sufficient drainage gradient is available.
c) Places free from air disturbances to the return air port and supply hole of the indoor unit, places where the fire alarm
may not malfunction to short circuit.
d) Places with the environmental dew-point temperature is lower than 28
˚
C and the relative humidity is less than 80%.
This unit is tested under ISO installation conditions to make sure that there are no defects. However, if it is
operated under conditions of high humidity that exceed the conditions above, there is danger of condensate falling
from the unit. If there is a possibility that the unit will be used under such conditions, dress 10~20 mm of insula-
tion on the entire unit body, the piping and drain pipe.
3) Check if the selected place for installation is rigid enough to stand the weight of thew unit.
Otherwise, apply reinforcement using boards and beams before starting the installation work.
Models
FDUM22, 28, 36, 45, 56
FDUM71, 90
FDUM112, 140
A
B
Mark
620
Inspection
space
B
100
A
Summary of Contents for FDC112KXEN6
Page 116: ... 112 4 Sensible heat capacity ...
Page 117: ... 113 ...
Page 118: ... 114 ...
Page 119: ... 115 ...
Page 120: ... 116 ...
Page 121: ... 117 ...
Page 122: ... 118 ...
Page 123: ... 119 ...
Page 124: ... 120 ...
Page 125: ... 121 ...
Page 126: ... 122 ...
Page 127: ... 123 ...
Page 128: ... 124 ...
Page 129: ... 125 ...
Page 130: ... 126 ...
Page 131: ... 127 ...
Page 132: ... 128 ...
Page 133: ... 129 ...
Page 134: ... 130 ...
Page 135: ... 131 ...
Page 136: ... 132 ...
Page 137: ... 133 ...
Page 138: ... 134 ...
Page 139: ... 135 ...
Page 140: ... 136 ...
Page 141: ... 137 ...
Page 142: ... 138 ...
Page 143: ... 139 ...
Page 144: ... 140 ...
Page 145: ... 141 ...
Page 146: ... 142 ...
Page 147: ... 143 ...
Page 148: ... 144 ...
Page 149: ... 145 ...
Page 150: ... 146 ...
Page 151: ... 147 ...
Page 152: ... 148 ...
Page 153: ... 149 ...
Page 154: ... 150 ...
Page 155: ... 151 ...
Page 156: ... 152 ...
Page 157: ... 153 ...
Page 158: ... 154 ...
Page 159: ... 155 ...
Page 160: ... 156 ...
Page 161: ... 157 ...
Page 162: ... 158 ...
Page 163: ... 159 ...
Page 164: ... 160 ...
Page 165: ... 161 ...
Page 166: ... 162 ...
Page 167: ... 163 ...
Page 168: ... 164 ...
Page 169: ... 165 ...
Page 170: ... 166 ...
Page 171: ... 167 ...
Page 172: ... 168 ...
Page 173: ... 169 ...