-
52
-
'09•KX-T-139
(1) Check operation
The following
①
–
③
can be checked automatically with this operation
.
①
Checking of operation valves opened/closed.
Checks to see if operation valves are opened.
②
Checking of mismatch on wiring or piping.
Checks to see if refrigerant piping or signal wiring between indoor and outdoor units in the same refrigerant system are
connected properly.
③
Checking of indoor expansion valve operation.
Checks to see if indoor expansion valve operates properly.
* Check operation should be performed before initial test run after completion of installation.
When any corrective measure for nonconformity has been taken, perform the check operation again after repair.
Operational condition
Temperature range: Outdoor air temperature … 0
㨪
43
℃
, Indoor air temperature … 10
㨪
32
℃.
Connecting capacity of indoor units: 80% or more of outdoor unit capacity.
Precautions
Check each outdoor unit system for single use or each refrigeration system for combination use.
Outdoor units in other refrigerant system shall not be operated.
After turning on power supply to outdoor unit and connected indoor units, start check operation with all connected indoor
units stopped.
In combination use, check the setting and the result displayed on the 7-segment display of master outdoor unit.
If the unit has been operating before check operation, wait for 5 minutes after stopping the unit operation before starting
check operation, in order to avoid misjudgment.
In combination use, judging operation valves opened or closed by check operation can be done as no good (NG), when
all of operation valves in liquid line, gas line and oil equalizing line of both master and slave outdoor units are closed.
However, in other cases than the above, judgment may not be done.
During check operation it is impossible to stop operation from remote controller. Accordingly, before starting check operation,
be sure to confirm that no one working near the indoor unit especially near the rotating part such as fan of indoor unit or
something is remaining near the fan of indoor unit.
Purpose
ޓ
The purpose of this check operation is only to verify any overlooked items to be checked during the ordinary checking done
at the site after installation. Accordingly it has no function to substitute the ordinary checking to be done during or after installation
work and to restore automatically as a result of checking operation.
ޓ
Therefore be sure to conduct the checking in ordinary way after installation firstly, and then to perform this check operation.
We believe that this checking method could prevent from overlooking any items to be checked.
7
CHECK OPERATION PROCEDURE
Summary of Contents for FDCH1010CKXE6G
Page 8: ... 09 KX T 139 2 2 Exterior dimensions Models FDCH335CKXE6G K 400CKXE6G 450CKXE6G PCB003Z141 ...
Page 9: ... 09 KX T 139 Models FDCH504CKXE6G 560CKXE6G 560CKXE6G K 615CKXE6G 680CKXE6G PCB003Z142 ...
Page 10: ... 09 KX T 139 2 3 Electrical wiring Models All model PCB003Z139 ...
Page 41: ......
Page 42: ... 40 09 KX T 139 ...
Page 63: ... 09 KX T 139 Combination use PCB003Z587 61 ...
Page 64: ... 09 KX T 139 2 2 Exterior dimensions Models FDCH335CKXE6G K 400CKXE6G 450CKXE6G PCB003Z589 62 ...
Page 65: ... 09 KX T 139 Models FDCH504CKXE6G 560CKXE6G 560CKXE6G K 615CKXE6G 680CKXE6G PCB003Z590 63 ...
Page 66: ... 09 KX T 139 2 3 Electrical wiring Models All model PCB003Z588 64 ...