-
-
'16 • PAC-T-240
C
P
JG
0
0
0
Z
0
2
9
[ ]
CNWR
WH
L
M
1 4 5 6 7
RD
F3
(
2A
)
CNM1
WH
FMI1
M
1 4 5 6 7
RD
F4
(
2A
)
CNM2
BK
FMI2
FS
FMI1,2
SW2
Connector
CNB
-
Z
Drain motor
DM
TB1
Closed-end connector
SW6
Operation check, Drain motor test run
SW7-1
Fuse
F1,3,4
Thi-R1,2,3
Thi-A
Thc
LED
・
3
LED
・
2
TB2
■
mark
Float switch
Indication lamp
(
Green-Normal operation
)
Indication lamp
(
Red-Inspection
)
Remote control communication address
Model capacity setting
Terminal block
(
Power source
)(□
mark
)
Terminal block
(
Signal line
)(□
mark
)
Thermistor
(
Remote control)
Thermistor
(
Return air
)
Thermistor
(
Heat exchanger
)
SW5
Plural units Master
/
Slave setting
Fan motor
(
with thermostat
)
Earth
Power source line
Signal line
1 2
3
indoor unit and outdoor unit
Connecting line between
BL
3
1
WH
CNW3
WH
RD
RD
1
2
CNI
BL
CNR
WH
DM
FS
CNZ
For HA
WH
M
1
2
CNTA
BL
1
2
RD
t
°
Control PCB
Power PCB
RD
YE
t
°
YE
BK
t
°
BK
1
2
3
4
5
6
BK
t
°
BK
1
2
XR1
XR2
XR3
XR4
XR5(Remote operation
input:volt-free contact
)
Prepare on site
1
2
3
4
5
6
+12
SW2
SW6
SW5
SW7
LED
・
2 LED
・
3
X
Y
1
3
X
Y
t
°
TB2
WH
BK
WH
8
9
10
11
12
8
9
10
11
12
CNW2
WH
CNW1
WH
CNB
WH
CNN
YE
CNH
BK
CNT
BL
1
2
WH
RD
YE
/
GN
3
5
CNW0
WH
1
TB1
Power circuit
(
Operation
)
(
Heating
)
(
Compressor ON
)
(
Inspection
)
3
Th
C
WH
WH
WH
WH
Remote control
WH
WH
WH
WH
WH
WH
WH
WH
3
4
5
6
7
1
2
5
6
7
2
3
4
1
YE
/
GN
RD
WH
Color
Mark
BK
Color marks
Meaning of marks
Black
BL
Blue
BR
Brown
OR
Orange
Color
Mark
RD
Red
WH
White
YE
Yellow
YE
/
GN Yellow
/
Green
L
Reactor
F1
(
5A
)
BK WH YE BL
BK WH YE BL
+12
(
Remote operation input:
volt-free contact
)
Powerful mode Valid
/
Invalid
SW7-3
Notes 1.
indicates wiring on site.
2. See the wiring diagram of outside unit about the line between
inside unit and outside unit.
3. Use twin core cord
(
0.3mm
2
×2)
at remote control line.
4. Do not put remote control line alongside power source line.
Thi-R1
Thi-R2
Thi-R2
Thi-A
(d) Duct connected-Low / Middle static pressure type (FDUM)
Model FDUM100VF2