-
-
'16 • PAC-T-240
Orange
OR
BR Brown
BK Black
Blue
Color marks
Meaning of marks
BL
Mark
Color
Red
RD
YE
WH
Yellow
White
GR Gray
YE
/
GN Yellow
/
Green
Mark
Color
Mark
Color
Notes 1.
indicates wiring on site.
2. See the wiring diagram of outside unit about the line between
inside unit and outside unit.
3. Use twin core cord
(
0.3mm
2
×
2
)
at remote control line.
4. Do not put remote control line alongside power source line.
LM
FMI
Fan motor
Louver motor
Indication lamp
(
Red-Inspection
)
Indication lamp
(
Green-Normal operation
)
LED
・
3
F200
-
203
Fuse
LED
・
2
Connector
CNB
-
Z
Remote control communication
address
SW2
L
Reactor
Model capacity setting
SW6
Operation check,Drain motor test run
SW7- 1
SW5
Thermistor
(
Remote control)
Thermistor
(
Heat exchanger
)
Thermistor
(
Return air
)
Thc
Thi-R1,2,3
Thi-A
TB2
Terminal block
(
Signal line
)(口
mark
)
Relay for DM
X4
TB1
Terminal block
(
Power source
)
(□
mark
)
Plural units Master
/
Slave setting
CNZ
BK
t
°
Control PCB
Power PCB
BK
BK
t
°
BK
GR
t
°
GR
1
2
3
4
5
6
BK
t
°
BK
1
2
XR1
XR2
XR3
XR4
XR5
(
Remote operation
input:volt-free contact
)
Prepare on site
1
2
3
4
5
6
+12
SW6
SW5
SW7
X
Y
1
3
X
Y
t
°
TB2
WH
BK
RD
1
2
3
4
5
1
2
3
4
5
CNW3
RD
CNW2
RD
BL
2
1
3
4
5
1
2
3
4
5
CNW4
BL
CNW1
BL
CNB
WH
CNN
YE
CNH
BK
CNT
BL
1
2
WH
RD
YE
/
GN
F200
(
3.15A
)
F201
(
3.15A
)
M
1 4 5 6 7
RD BL BR OR WH
F202
(
1.0A
)
F203
(
0.16A
)
CNM
WH
X4
5
3
CNW0
WH
1
3
7
TB1
M
1
~
CNR
WH
LM
Power circuit
(
Operation
)
(
Heating
)
(
Compressor ON
)
(
Inspection
)
YE
/
GN
3
BL
1
YE
/
GN
Th
C
CNB2
WH
CNJ2
BL
WH OR
WH BR
(
With red tape
)
CNI
BL
Earth
Power source line
Signal line
1 2
3
indoor unit and outdoor unit
Connecting line between
RD
BL
RD
BL
RD
BL
RD
BL
Remote control
(
With yellow tape
)
FMI
CNWR
RD
L
RD
For HA
WH
SW2
LED
・
2 LED
・
3
[ ]
Thi-R1
Thi-R2
Thi-R2
Thi-A
B
P
G
A
0
0
0
Z
7
8
3
(e) Floor standing type (FDF)
Model FDF100VD2