RLD012A001
○
Uncover the wireless remote control, and mount the batteries [R03 (AAA, Micro),
×2 pieces] in the body regularly.
(Fit the poles with the indication marks, + &
−
without fail)
○
Conventionally, operate the wireless remote control
by holding in your hand.
○
Avoid installing it on a clay wall etc.
Cover
Wood screws
ø3.5 X 16
Wireless remote control
Battery
INSTALLATION OF WIRELESS REMOTE CONTROL
Mounting method of battery
Fixing to pillar or wall
2
6
5
Reception
pip
Disconnect
TIME SETUP ACL
When two air-conditioners are installed in the same room, use this setting when the two air-conditioners are not operated with one
wireless remote control. Set the wireless remote control and indoor unit.
INSTALLING TWO AIR-CONDITIONERS IN THE SAME ROOM
Setting the wireless remote control
Pull out the cover and take out
batteries.
Disconnect the
switching line
next to the
battery with
wire cutters.
Insert batteries. Close the cover.
1
2
3
Setting an indoor unit
1
2
3
INSTALLATION TEST CHECK POINTS
After installation
The power source voltage is correct as the rating.
No gas leaks from the joints of the service valve.
Power cables and crossover wires are securely fixed to
the terminal board.
Test run
Air-conditioning operation is normal.
No abnormal noise.
Water drains smoothly.
Protective functions are not working.
The wireless remote control is normal.
Operation of the unit has been explained to the customer. (Three-minutes restart preventive timer)
When the air-conditioner is restarted or when changing the operation, the unit will not start operating for
approximately 3 minutes. This is to protect the unit and it is not a malfunction.
The screw of the lid is tightened securely.
Service valve is fully open.
The pipe joints for indoor and outdoor pipes
have been insulated.
Check the following points again after completion of the installation, and before turning on the power. Conduct a test run again and ensure that the unit operates properly.
At the same time, explain to the customer how to use the unit and how to take care of the unit following the user’s manual.
Turn off the power
source
, and turn it on after
1 minute.
Point the wireless remote control that was set
according to the procedure described on the
left side at the indoor unit and send a signal by
pressing the ACL switch on the wireless remote control.
Since the signal is sent in about 6 seconds after the ACL switch is
pressed, point the wireless remote control at the indoor unit for some time.
Check that the reception buzzer sound "pip" is emitted from the
indoor unit.
At completion of the setting, the indoor unit emits a buzzer sound
"pip". (If no reception tone is emitted, start the setting from the
beginning again.)
○
Arrange the drain hose in a downward angle.
○
Avoid the following drain piping.
○
Pour water to the drain pan located under the heat exchanger, and ensure that the water is discharged outdoor.
○
When extended drain hose is present inside the room, insulate it securely with heat insulator available in the market.
CAUTION
Wall
Gutter
Pipe accommodating section
Drainage
y
v
a
W
d
ei
fi
c
e
p
s
n
a
h
t
r
e
h
gi
H
Installation Steps
• How to remove the indoor unit from the installation board
Fixing of indoor unit
Push up at the marked portion of the indoor unit base lower latch, and slightly pull it toward
you. (both right and left hand sides) (The indoor unit base lower latch can be removed from
the installation board)
Push up the indoor unit upward so that it can be removed from installation board.
latch
Installation board
Indoor unit base latch
Wall
Go through all installation steps and check if the drainage is all right.
Otherwise water leak may occur.
2
1
2
1
Gently push the lower
part to secure the unit.
Pass the pipe through
the hole in the wall,
and hook the upper
part of the indoor unit
to the installation
board.
Since this air-conditioner has been designed to collect dew drops on the rear
surface to the drain pan, do not attach the power cord above the gutter.
The drain hose
tip is in water.
The gap to the ground is
5 cm or less.
The drain hose
tip is in the gutter.
Odor from
the gutter
Installation board
Indoor unit
Latch (2 locations)
Open/close and detachment/attachment of the air inlet panel
○
To open, pull the panel at both ends of lower part and
release latches, then pull up the panel until you feel
resistance.
(The panel stops at approx. 60° open position)
○
To close, hold the panel at both ends of lower part to
lower downward and push it slightly until the latch
works.
○
To remove, pull up the panel to the position shown in
right illustration and pull it toward you.
○
To install, insert the panel arm into the slot on the front
panel from the position shown in right illustration, hold
the panel at both ends of lower part, lower it downward
slowly, then push it slightly until the latch works.
To remove / To install
Approx. 80°
• Flaring work
Measurement B
Flaring
block
Copper pipe
Finishing work and fixing
Connection wiring,
Earth wiring
Outer tape
Refrigerant piping
Drain hose
Wood screw
Clamp
○
Install the removed flared nuts to the pipes to be connected,
then flared the pipes.
○
Remove the flared nuts. (on both liquid and gas sides)
Keep the openings of the pipes covered with tapes etc. to prevent dust, sand, etc. from entering them.
CONNECTION OF REFRIGERANT PIPINGS
Preparation
(Do not turn)
Press
Remove
A
Dimension A
CAUTION
Do not apply refrigerating machine
oil to the flared surface.
Indoor
CAUTION
Do not apply excess torque to the flared nuts.
Otherwise, the flared nuts may crack.
○
Connect the pipes on both liquid and gas sides.
○
Tighten the nuts to the following torque.
n
o
it
r
o
p
n
o
it
c
e
n
n
o
c
e
h
t
f
o
n
o
it
a
l
u
s
n
I
n
o
it
c
e
n
n
o
C
Indoor
(Do not turn)
• Cover the indoor unit’s flare-connected joints, after they are checked for a gas leak, with an indoor
unit heat insulating material and then wrap them with a tape with an attached insulation pad placed
over the heat insulating material’s slit area.
Cover the coupling with insulator and then cover it with tapes.
Vinyl tape
Use an attached insulation pad for heat insulation.
Position it so that the slit area faces upward.
Liquid side
Gas side
Cover the exterior portion with outer tape and
shape the piping to match with the contours of
the route that piping will take.
Also fix the wiring and pipings to the wall with
clamps.
Copper pipe diameter
Use a flare tool designed for R410A or a conventional flare tool.
Note that measurement B (protrusion from the flaring block) will vary depending on the type of
a flare tool in use.
If a conventional flare tool is used, use a copper pipe gauge or a similar instrument to check
protrusion so that you can keep measurement B to a correct value.
Clutch type flare tool for
R410A
Conventional (R22) flare tool
ø6.35
ø15.88
0.0 - 0.5
0.0 - 0.5
1.0 - 1.5
1.0 - 1.5
1.5 - 2.0
2.0 - 2.5
ø12.7
0.0 - 0.5
1.0 - 1.5
2.0 - 2.5
ø9.52
0.0 - 0.5
1.0 - 1.5
1.5 - 2.0
Measurement B (mm)
Clutch type
Wing nut type
How to remove and install the front panel
Latch
○
Removing
○
Installing
Remove the air filter.
Cover the unit with the front panel.
Tighten the 8 screws to fix the
front panel.
Install the air filter.
Install the air inlet panel.
Front panel
Air inlet panel
Air filter
Screw
5
4
3
2
1
3
2
1
Remove the air inlet panel.
Remove the 8 screws fixing to the
front panel.
Remove the 5 latches in the upper
section of the front panel and then
remove the front panel from the unit.
Open the air inlet panel.
Remove the lid.
Remove the wiring clamp.
Connect the connecting wire securely to the terminal block.
1) Connect the connection wire securely to the terminal
block. If the wire is not affixed completely, contact will be
poor, and it is dangerous as the terminal block may heat
up and catch fire.
2) Take care not to confuse the terminal numbers for indoor
and outdoor connections.
Fix the connecting wire by wiring clamp.
Attach the lid.
Close the air inlet panel.
ELECTRICAL WIRING WORK
Preparation of indoor unit
Mounting of connecting wires
7
6
5
4
3
2
1
Use cables for interconnection wiring to avoid loosening of the wires.
CENELEC code for cables Required field cables.
H05RNR4G1.5 (example) or 245IEC57
H Harmonized cable type
05 300/500 volts
R
Natural-and/or synth, rubber wire insulation
N
Polychloroprene rubber conductors insulation
R Stranded core
4or5 Number of conductors
G
One conductor of the cable is the earth conductor
(yellow/green)
1.5 Section of copper wire (mm
2
)
Terminal block
Wiring
Clamp
Lid
• Earth wire shall be Yellow/Green (Y/G) in color and longer than other AC wires for safety reason.
The screw of the lid is
tightened securely
Connecting wire
• Pass the connecting wire through the path from
the bottom of the control box to the front part as
shown in the illustration.
• Forced cooling operation
Turn off power
source. Turn on power source again after a while. Then, press the
ON/OFF button continuously for at least 5 seconds. (The operation will start.)
TERMINAL CONNECTION FOR AN INTERFACE
Remove the air inlet panel, lid and front panel.
Remove the control cover. (Remove the screw.)
There is a terminal (respectively marked with CNS) for the indoor control board.
In connecting an interface, connect to the respective terminal securely with the connection harness
supplied with an option “Interface connection kit SC-BIKN-E” and fasten the connection harness
onto the indoor control box with the clamp supplied with the kit.
For more details, refer to the user’s manual of your “Interface connection kit SC-BIKN-E”.
3
2
1
3
2
1
Connect charge hose to check joint of outdoor unit.
Liquid side : Close the liquid valve with hexagon wrench key.
Gas side : Fully open the gas valve.
Carry out cooling operation. (If indoor temperature is low, operate
forced cooling operation.)
After low pressure gauge become 0.01MPa, stop cooling operation
and close the gas valve.
<How to pump down>
○
In order to protect the environment, be sure to pump down (recovery of refrigerant).
○
Pump down is the method of recovering refrigerant from the indoor unit to the outdoor
unit when the pipes are removed from the unit.
HOW TO RELOCATE OR DISPOSE OF THE UNIT
Indoor unit PCB
screw
Unit ON/OFF button
Control cover
CNS terminal
Installing the air-cleaning filters
Open the air inlet panel and remove the air filters.
Install the air-cleaning filter in the filter holders, and then install the filter
holders in the air-conditioner.
• Each air-cleaning filter can be installed in the left or right filter holder.
Install the air filters and close the inlet panel.
Filter holder
Air-cleaning
filter
If FDC71VNP is connected, use reducer at gas
side of indoor unit to change the pipe size from
ø15.88 to ø12.7. (Reducer is attached in the
outdoor unit accessory)
○
In case of faulty wiring connection,
indoor unit does not operate. Then,
run lamp turns on and timer lamp
blinks.
○
Do not use new and old batteries
together.
Liquid side ø6.35 : 9.1 (mm)
ø9.52 : 13.2 (mm)
Gas side ø9.52 : 13.2 (mm)
ø12.7 : 16.6 (mm)
ø15.88 : 19.7 (mm)
Liquid side (ø6.35) : 14.0 - 18.0 N·m (1.4 - 1.8 kgf·m)
(ø9.52) : 34.0 - 42.0 N·m (3.4 - 4.2 kgf·m)
Gas side (ø9.52) : 34.0 - 42.0 N·m (3.4 - 4.2 kgf·m)
(ø12.7) : 49.0 - 61.0 N·m (4.9 - 6.1 kgf·m)
(ø15.88) : 68.0 - 82.0 N·m (6.8 - 8.2 kgf·m)
1
2
3
90 ± 0.5
°