-
36
-
'10 • PAC-SM-137
A
2)
Model FDC 125VNX, 140VNX
2)
Model
a)
Replace the PCB
after elapsing 3 minutes from power OFF
.
b)
Measurement was done on both ends of connector(CNA1) during measurement,
the voltage(DC) might charged
the electrolytic capacitor, be sure that the voltage is discharged sufficiently.
(Refer to Fig.1)
c)
Disconnect the connectors from the control PCB.
d)
Disconnect the white or blue wiring passing through CT1 on the PCB before replacing the PCB.
e)
Match the setting switches (SW3-5, JSW, SW(J5-7)) with the former PCB.
f)
Tighten up a screw after passing white or blue wiring through CT1 of the changed.
g)
Please connect the connectors with the same place. (Confirm the
connectors are not half inserted
.)
PCA012D024F
H
after elapsing 3 minutes
from power OFF
㩷
connectors are not half
inserted
Parts Arrangement View
CNA2
CNIP
CNTH
CNPS
CNI1
CNI3
CNA1
CNFAN1
CNEEV2
CNEEV1
CNS
CNR
CNH
CNW
CNW2
JSW
SW5
SW4
SW3
CNB
CT1
㧼
㧯㧭㧡
㧜㧡
㧭㧝㧤
㧣
SW
䋨
J5-7
䋩
CNF
CNN1
CNM
CNN2
Fig.1 Enlarged figure of parts location
CNFAN2
Voltage measurement parts
(Pin terminals1-2 of CNA1)
(
㧙
)
(
㧗
)
Summary of Contents for FDEN125VNXVD
Page 101: ... 101 10 PAC SM 137A ...
Page 106: ... 106 10 PAC SM 137A 2 Models FDC100 140VNX 100 140VSX ...
Page 107: ... 107 10 PAC SM 137A ...
Page 108: ... 108 10 PAC SM 137A ...
Page 109: ... 109 10 PAC SM 137A ...
Page 110: ... 110 10 PAC SM 137A ...
Page 111: ... 111 10 PAC SM 137A ...
Page 112: ... 112 10 PAC SM 137A ...
Page 113: ... 113 10 PAC SM 137A ...
Page 114: ... 114 10 PAC SM 137A 5 4 Electric wiring work installation ...
Page 115: ... 115 10 PAC SM 137A ...
Page 116: ... 116 10 PAC SM 137A ...
Page 117: ... 118 10 PAC SM 137A ...
Page 118: ... 118 10 PAC SM 137A ...