background image

-

32 

-

4. CONNECTING PIPING WORK 

1. Restrictions on unit installation

Abide by the following restrictions on unit installation. 

Improper installation can cause compressor failure or performance degradation.

Dimensional restrictions

H

L

Model SRC20/25/35 Model SRC40/50/60

Connecting pipe length(L)

25m or less

30m or less

Elevation difference between 

indoor and outdoor units(H)*

15m or less

20m or less

* Outdoor unit installation position can be higher as well as lower than the indoor unit installation position.

2. Preparation of connecting pipe

2.1. Selecting connecting pipe 

Select connecting pipe according to the following table.

Model SRC20/25/35 Model SRC40/50/60

Gas pipe

ø9.52

ø12.7

Liquid pipe

ø6.35

ø6.35

•  Pipe wall thickness must be greater than or equal to 0.8 mm.

• Pipe material must be O-type (Phosphorus deoxidized seamless copper pipe ICS 23.040.15, ICS

77.150.30).

NOTE

If it is required to reuse the existing connecting pipe system, refer to 5. UTILIZATION OF EXISTING

PIPE.

2.2. Cutting connecting pipe 

(1) Cut the connecting pipe to the required length with pipe cutter.

(2) Hold the pipe downward and remove the burrs. Make sure that no foreign material enters the pipe.

(3) Cover the connecting pipe ends with the tape.

3. Piping work

Check that both liquid and gas service valves are fully closed. 

Carry out the piping work with service valves fully closed.

Liquid service valve

Gas service valve

3.1. Flaring pipe

(1) Take out flare nuts from the service valves of outdoor unit and engage them onto connecting pipes. 

(2) Flare the pipes according to table and figure shown below. 

Flare dimensions for R32 are different from those for conventional refrigerant.

Although it is recommended to use the flaring tools designed specifically for R32 or R410A, conventional

flaring tools can also be used by adjusting the measurement of protrusion B with a flare adjustment gauge.

A

Copper pipe

outer diameter

 A   0 

–0.4

B

Copper pipe 

outer diameter

Rigid (clutch) type

R32 or 

R410A Conventional 

ø6.35

9.1

ø6.35

0-0.5

1.0-1.5

ø9.52

13.2

ø9.52

ø12.7

16.6

ø12.7

3.2. Connecting pipes

(1) Connect pipes on both liquid and gas sides.

(2) Tighten nuts to specified torque shown in the table below.

Service valve size (mm)

Tightening torque (N·m)

ø6.35 (1/4")

14-18

ø9.52 (3/8")

34-42

ø12.7 (1/2")

49-61

Do not hold the valve cap area with a spanner

CAUTION

• Do not apply refrigerating machine oil to the flared surface. It can cause refrigerant leakage. 

• Do not apply excess torque to the flared nuts. The flared nuts may crack resulting in refrigerant leakage.

4. Evacuation

(1) Connect vacuum pump to gauge manifold. Connect charge hose of gauge manifold to service port 

of outdoor unit.

(2)  Run the vacuum pump for at least one hour after the vacuum gauge shows -0.1MPa (–76cm Hg).

(3) Confirm that the vacuum gauge indicator does not rise even if the system is left for 15 minutes or more.

Vacuum gauge indicator will rise if the system has moisture left inside or has a leakage point.

Check the system for the leakage point. If leakage point is found, repair it and return to (1) again.

(4)  Close the Handle Lo and stop the vacuum pump.

Keep this state for a few minutes to make sure that the compound pressure gauge pointer does not 

swing back.

(5)  Remove valve caps from liquid service valve and gas operation valve.

(6) Turn the liquid service valve's rod 90 degree counterclockwise with a hexagonal wrench key to open 

valve.

Close it after 5 seconds, and check for gas leakage.

Using soapy water, check for gas leakage from indoor unit's flare and outdoor unit's flare and valve rods.

Wipe off all the water after completing the check.

(7) Disconnect charging hose from gas service valve's service port and fully open liquid and gas service

valves. (Do not attempt to turn valve rod beyond its stop.)

(8)  Tighten service valve caps and service port cap to the specified torque shown in the table below.

Service valve size (mm)

Service valve cap tightening 

torque (N·m)

Service port cap tightening 

torque (N·m)

ø6.35 (1/4")

20-30

10-12

ø9.52 (3/8")
ø12.7 (1/2")

25-35

Charge hose

Handle Lo

Valve cap

Liquid service valve

Gas service valve

Service port

Compound pressure gauge

Pressure gauge

Gauge manifold

Handle Hi

Vacuum pump

CAUTION

To prevent vacuum pump oil from entering into the refrigerant system, use a counterflow prevention adapter.

5.  Additional refrigerant charge

Additional refrigerant charge is required only when connecting pipe length exceeds 15 m.

5.1 Calculating additional refrigerant charge

Additional refrigerant charge can be calculated using the formula given below.

Additional refrigerant charge (g) = { Connecting pipe length (m) – Factory charged length 15 (m) } x 20 (g/m)

NOTE

• If additional refrigerant charge calculation result is negative, there is no need to remove the refrigerant.

• If refrigerant recharge is required for the unit with connecting pipe length 15m or shorter, charge the 

factory charged amount as shown in the table below.

• The maximum refrigerant charge amount is designed as shown in the table below. 

Model SRC 20/25/35

Model SRC40/50/60

The factory refrigerant charge amount(kg)

1.20

1.30

The maximum refrigerant charge amount(kg)

1.40

1.60

5.2 Charging refrigerant

(1) Charge the R32 refrigerant in liquid phase from service port with both liquid and gas service valves 

shut. Since R32 refrigerant must be charged in the liquid phase, make sure that refrigerant is dis-

charged from the cylinder in the liquid phase all the time.

(2) When it is difficult to charge a required refrigerant amount, fully open both liquid and gas service

valves and charge refrigerant, while running the unit in the cooling mode. When refrigerant is

charged with the unit being run, complete the charge operation within 30 minutes.

(3) Write the additional refrigerant charge calculated from the connecting pipe length on the label at-

tached on the service cover.

CAUTION

• Running the unit with an insufficient quantity of refrigerant for a long time can cause unit malfunction.

• Do not charge more than the maximum refrigerant amount. It can cause unit malfunction.

5. UTILIZATION OF EXISTING PIPE

(1) Check whether an existing pipe system is reusable or not by using the following flow chart.

Repair is impossible.

Air tightness is 

impossible.

Repair is impossible.

Repair

Air tightness is OK.

Repair

Repair

NO

NO

NO

NO

NO

NO

NO

Are the outdoor and indoor units connected to the existing pipe system ?

Does the existing unit use any of the following refrigerant oils ?

Suniso, MS,Barell Freeze, HAB, Freol, ether oil, ester oil.

Do the existing pipe specifications (pipe length, pipe size and elevation difference between indoor and outdoor unit) conform to the restric-

tion of the unit.? (Go to 4.CONNECTING PIPING WORK and check 1.Restrictions on unit installation and 2.Preparation of connecting pipe.)

Is the existing pipe system free of gas leaks?

(Check whether refrigerant charge was required 

frequently for the system before.)

Is the existing pipe system free of corrosion, flaws and dents?

Are heat insulation materials of the existing pipe system 

free of peel-off or deterioration?

(Heat insulation is necessary for both gas and liquid pipes.)

Is the existing piping system free of any loose pipe support ?

The existing pipe system is reusable.

The existing pipe system is not reusable. 

Install the new pipe system.

Repair the damaged parts.

Check the pipe system for air tightness.

Repair the damaged parts.

Repair the loose pipe support.

NO

Is it possible to run the unit ?

YES

YES

YES

YES

YES

YES

YES

YES

NOTE

• Consult with our distributor in the area, if you need to recover refrigerant and charge it again.

(2) Clean the existing pipe system according to the procedure given below.

(a) Carry out forced cooling operation of existing unit for 30 minutes.

For ‘Forced cooling operation’ refer to the indoor unit installation manual.

(b) Stop the indoor fan and carry out forced cooling operation for 3 minutes (Liquid return).

(c) Close the liquid service valve of the outdoor unit and carry out pump down operation (Refer to 6. 

PUMP DOWN).

(d) Blow with nitrogen gas. If discolored refrigeration oil or any foreign matter is discharged by the 

blow, wash the pipe system or install a new pipe system.

(3) Remove the flare nuts from the existing pipe system. Go back to 4.CONNECTING PIPING WORK 

and proceed to step 2.2 Cutting connecting pipe.

CAUTION

•  Do not use the old flare nuts (of existing unit). Make sure that the flare nuts supplied with the (new) 

outdoor unit are used.

•  If the flared / compression connection to the indoor unit is located inside the house / room then this 

pipework can’t be reused.

* If the existing piping is specified as liquid pipe ø9.52 or gas pipe ø12.7, refer to the following. (SRC40,50

and 60 only)

<Table of pipe size restrictions>

Additional charge volume per meter of pipe

0.054kg/m

Pipe size

Liquid pipe

ø9.52

Gas pipe

ø12.7

Maximum one-way pipe length

10

Length covered without additional charge

5

Additional charge amount (kg) = {Main pipe length (m) - Length covered without additional

charge shown in the table (m)} X Additional charge amount per meter of pipe shown in the table (kg/m)

6. PUMP DOWN

(1) Connect charge hose of gauge manifold to service port of outdoor unit.

(2) Close the liquid service valve with hexagonal wrench key.

(3) Fully open the gas service valve with hexagonal wrench key.

(4) Carry out forced cooling operation (For forced cooling operation procedure, refer to indoor unit installation 

manual).

(5) When the low pressure gauge becomes 0.01MPa, close the gas service valve and stop forced cooling

operation.

Service port

Gauge manifold

Charge hose

7. ELECTRICAL WIRING WORK

 WARNING

• Make sure that all the electrical work is carried out in accordance with the national or regional electri-

cal standards.

• Make sure that the earth leakage breaker and circuit breaker of appropriate capacities are installed 

  (Refer to the table given below).

• Do not turn on the power until the electrical work is completed.

• Do not use a condensive capacitor for power factor improvement under any circumstances. 

  (It does not improve power factor. Moreover, it can cause an abnormal overheat accident).

Breaker specifi cations

Model

Phase

Earth leakage breaker

Circuit breaker

SRC20/25/35

Single phase

Leakage current: 30mA, 

0.1sec or less

Over current: 16A

SRC40/50/60

Over current: 20A

Main fuse specifi cation

Model

Specifi cation

Parts No.

Code on LABEL,WIRING

SRC20/25/35

250V 15A

SSA564A136

F7

SRC40/50/60

250V 20A

SSA564A136A

F4

1.Preparing cable

(1) Selecting cable

Select the power source cable and connecting cable in accordance with the specifi cations mentioned below.

(a) Power source cable

3 cores* 2.5mm

2

 or more, conformed with 60245 IEC57

When selecting the power source cable  length, make sure that voltage drop is less than 2%.

If the wire length gets longer, increase the wire diameter.

(b) Connecting cable

4 cores* 1.5mm

2

, conformed with 60245 IEC57

* 1 Earth wire is included (Yellow/Green).

(2) Arrange each wire length as shown below.

Make sure that each wire is stripped 10mm from the end.

<Power source cable>

<Connecting cable>

<Wire end>

Earth wire

40mm or more

30mm or more

40mm or more

Earth wire

30mm or more

10mm

(3) Attach round crimp-type terminal to each wire as shown in the below.

Select the size of round crimp-type terminal  after considering the specifi cations of terminal block and wire 

diameter.

10mm

Round crimp-type terminal

Sleeve

 CAUTION

Power source cable and connecting cable must conform to the specifi cations mentioned in the manual. 

Using cables with wrong specifi cations may result in unit malfunction.

2.Connecting cable 

(1) Remove the service cover.

(2) Connect the cables according to the instructions and fi gures given below.

 (a) Connect the earth wire of power source cable.

An earth wire must be connected before connecting the other wires of power source cable.

Keep the earth wire longer than the remaining two wires of power source cable.

 (b) Connect the remaining two wires (N and L) of power source cable.

 (c)  Connect the wires of connecting cable. Make sure that for each wire, outdoor and indoor side ter-

minal numbers match.

(3)  Fasten the cables properly with cable clamps so that no external force may work on terminal connec-

tions. 

 Moreover, make sure that cables do not touch the piping, etc. When cables are connected, make sure 

that all electrical components within the electrical component box are free of loose connector coupling 

or terminal connection.

<Circuit diagram>

N L

1 2/N 3

1 2/N 3

Circuit 

breaker

Earth 

leakage 

breaker

Earth

Power

source

Indoor unit

Outdoor unit

Connecting cable

Power 

source 

cable

<SRC20/25/35>

<SRC40/50/60>

Power 

source 

cable

Connecting 

cable

Connecting 

cable

Cable clamp

8. FINISHING WORK

1. Heating and condensation prevention

(1)  Dress the connecting pipes (both liquid and gas pipes) with insulation to prevent it from heating 

and dew condensation. 

 Use the heat insulating material which can withstand 120°C or higher temperature. Make sure that 

insulation is wrapped tightly around the pipes and no gap is left between them. 

(2) Wrap the refrigerant pipings of indoor unit with indoor unit heat insulation using tape. 

(3)  Cover the fl are-connected joints (indoor side) with the indoor unit heat insulation and wrap it with 

an insulation pad (standard accessory provided with indoor unit). 

(4) Wrap the connecting pipes, connecting cable and drain hose with the tape.

(2)

(3)

(4)

Tape

Insulation pad

Position it so that the slit area faces upward.

Connecting cable

Liquid pipe

Drain hose

Gas pipe

Insulation

Tape

NOTE

Locations where relative humidity exceeds 70%, both liquid and gas pipes need to be dressed with 20mm  or 

thicker heat insulation materials.

2.Finishing work 

(1)  Make sure that the exterior portion of connecting pipes, connecting cable and drain hose is wrapped 

properly with tape. Shape the connecting pipes to match with the contours of the pipe assembly route.

(2)  Fix the pipe assembly with the wall using clamps and screws. Pipe assembly should be anchored ev-

ery 1.5m or less to isolate the vibration.

(3)  Install the service cover securely. Water may enter the unit if service cover is not installed properly, 

resulting in unit malfunction and failure. 

Pipe assembly

Screw

Clamp

 CAUTION

• Improper insulation can cause condensate(water) formation during cooling operation. 

Condensate can leak or drip causing damage to household property.

• Poor heat insulating capacity can cause pipe outer surface to reach high temperature during heating 

operation. It can cause cable deterioration and personal injury. 

 CAUTION

Make sure that the connecting pipes do not touch the components within the unit. If pipes touch the 

internal components, it may generate abnormal sounds and/or vibrations.

9. INSTALLATION TEST CHECK POINTS

After fi nishing the installation work, check the following points again before turning on the power. 

Conduct test run (Refer to indoor unit installation manual) and ensure that the unit operates properly. 

RWC012A063B

Power source voltage complies with the rated voltage of air-conditioner.
Earth leakage breaker and circuit breaker are installed.
Power cable and connecting cable are securely fi xed to the terminal block.
Both liquid and gas service valves are fully open.

No gas leaks from the joints of the service valves.
Indoor and outdoor side pipe joints have been insulated.
Drain hose (if installed) is fi xed properly.
Screw of the service cover is tightened properly.

’20

SRF-DB-310D

-

31 

-

4. CONNECTING PIPING WORK

1. Restrictions on unit installation

Abide by the following restrictions on unit installation. 

Improper installation can cause compressor failure or performance degradation.

Dimensional restrictions

H

L

Model SRC20/25/35 Model SRC40/50/60

Connecting pipe length(L)

25m or less

30m or less

Elevation difference between 

indoor and outdoor units(H)*

15m or less

20m or less

* Outdoor unit installation position can be higher as well as lower than the indoor unit installation position.

2. Preparation of connecting pipe

2.1. Selecting connecting pipe 

Select connecting pipe according to the following table.

Model SRC20/25/35 Model SRC40/50/60

Gas pipe

9.52

12.7

Liquid pipe

6.35

6.35

.

m

m

 

8

.

0

 

o

l

a

u

q

e

 r

o

 

n

a

h

r

e

t

a

e

r

g

 

e

b

 t

s

u

m

 

s

s

e

n

k

c

i

h

ll

a

w

 

e

p

i

P

 

 •

S

C

,

5

1

.

0

4

0

.

3

2

 

S

C

e

p

i

p

 r

e

p

p

o

c

 

s

s

e

l

m

a

e

s

 

d

e

z

i

d

i

x

o

e

d

 

s

u

r

o

h

p

s

o

h

P

(

 

e

p

y

t-

O

 

e

b

 t

s

u

m

 l

a

ir

e

t

a

m

 

e

p

i

P

 

77.150.30).

NOTE

 

G

N

I

T

S

I

X

E

 

F

O

 

N

O

I

T

A

Z

I

L

I

T

U

 .

5

 

o

r

e

f

e

r

 ,

m

e

t

s

y

s

 

e

p

i

p

 

g

n

it

c

e

n

n

o

c

 

g

n

it

s

i

x

e

 

e

h

e

s

u

e

r

 

o

d

e

ri

u

q

e

r

 

s

ti

 f

PIPE.

2.2. Cutting connecting pipe 

(1) Cut the connecting pipe to the required length with pipe cutter.

(2) Hold the pipe downward and remove the burrs. Make sure that no foreign material enters the pipe.

(3) Cover the connecting pipe ends with the tape.

3. Piping work

 .

d

e

s

o

l

c

 

y

ll

u

e

r

a

 

s

e

v

l

a

v

 

e

c

i

v

r

e

s

 

s

a

g

 

d

n

a

 

d

i

u

q

il

 

h

t

o

b

 t

a

h

k

c

e

h

C

 

Carry out the piping work with service valves fully closed.

Liquid service valve

Gas service valve

3.1. Flaring pipe

(1)  Take out 

 are nuts from the service valves of outdoor unit and engage them onto connecting pipes. 

(2)  Flare the pipes according to table and 

 gure shown below. 

 Flare dimensions for R32 are different from those for conventional refrigerant.

 Although it is recommended to use the 

 aring tools designed speci

 cally for R32 or R410A, conventional 

 aring tools can also be used by adjusting the measurement of protrusion B with a 

 are adjustment gauge.

A

Copper pipe

outer diameter

 A   0 

–0.4

B

Copper pipe 

outer diameter

Rigid (clutch) type

R32 or 

R410A Conventional 

6.35

9.1

6.35

0-0.5

1.0-1.5

9.52

13.2

9.52

12.7

16.6

12.7

3.2. Connecting pipes

(1) Connect pipes on both liquid and gas sides.

(2) Tighten nuts to speci

 ed torque shown in the table below.

Service valve size (mm)

Tightening torque (N·m)

6.35 (1/4")

14-18

9.52 (3/8")

34-42

12.7 (1/2")

49-61

Do not hold the valve cap area with a spanner

 CAUTION

• Do not apply refrigerating machine oil to the 

 ared surface. It can cause refrigerant leakage. 

• Do not apply excess torque to the 

 ared nuts. The 

 ared nuts may crack resulting in refrigerant leakage.

4. Evacuation

 t

r

o

p

 

e

c

i

v

r

e

s

 

o

d

l

o

fi

n

a

m

 

e

g

u

a

g

 f

o

 

e

s

o

h

 

e

g

r

a

h

c

 t

c

e

n

n

o

C

 .

d

l

o

fi

n

a

m

 

e

g

u

a

g

 

o

p

m

u

p

 

m

u

u

c

a

v

 t

c

e

n

n

o

C

  

)

1

(

of outdoor unit.

.)

g

H

 

m

c

6

7

a

P

M

1

.

0

s

w

o

h

s

 

e

g

u

a

g

 

m

u

u

c

a

v

 

e

h

r

e

tf

a

 r

u

o

h

 

e

n

o

 t

s

a

e

t

a

 r

o

p

m

u

p

 

m

u

u

c

a

v

 

e

h

n

u

R

  

)

2

(

.

e

r

o

m

 r

o

 

s

e

t

u

n

i

m

 

5

1

 r

o

tf

e

s

m

e

t

s

y

s

 

e

h

fi

 

n

e

v

e

 

e

s

ir

 t

o

n

 

s

e

o

d

 r

o

t

a

c

i

d

n

e

g

u

a

g

 

m

u

u

c

a

v

 

e

h

t

a

h

m

n

o

C

  

)

3

(

.t

n

i

o

p

 

e

g

a

k

a

e

a

 

s

a

h

 r

o

 

e

d

i

s

n

tf

e

e

r

u

t

s

i

o

m

 

s

a

h

 

m

e

t

s

y

s

 

e

h

fi

 

e

s

ir

 l

li

w

 r

o

t

a

c

i

d

n

e

g

u

a

g

 

m

u

u

c

a

V

 

.

n

i

a

g

a

 )

1

o

n

r

u

t

e

d

n

a

 t

ri

a

p

e

,

d

n

u

o

s

t

n

i

o

p

 

e

g

a

k

a

e

fI

 .

t

n

i

o

p

 

e

g

a

k

a

e

e

h

r

o

m

e

t

s

y

s

 

e

h

k

c

e

h

C

 

.

p

m

u

p

 

m

u

u

c

a

v

 

e

h

p

o

t

s

 

d

n

a

 

o

L

 

e

l

d

n

a

H

 

e

h

e

s

o

l

C

  

)

4

(

 t

o

n

 

s

e

o

d

 r

e

t

n

i

o

p

 

e

g

u

a

g

 

e

r

u

s

s

e

r

p

 

d

n

u

o

p

m

o

c

 

e

h

t

a

h

e

r

u

s

 

e

k

a

m

 

o

s

e

t

u

n

i

m

 

w

e

a

 r

o

e

t

a

t

s

 

s

i

h

p

e

e

K

 

swing back.

service valve.

 

s

a

g

 

d

n

a

 

e

v

l

a

v

 

e

c

i

v

r

e

s

 

d

i

u

q

il

 

m

o

rf

 

s

p

a

c

 

e

v

l

a

v

 

e

v

o

m

e

R

  

)

5

(

 

n

e

p

o

 

o

y

e

k

 

h

c

n

e

r

w

 l

a

n

o

g

a

x

e

h

 

a

 

h

ti

w

 

e

s

i

w

k

c

o

l

c

r

e

t

n

u

o

c

 

e

e

r

g

e

d

 

0

9

 

d

o

s

'

e

v

l

a

v

 

e

c

i

v

r

e

s

 

d

i

u

q

il

 

e

h

n

r

u

 )

6

(

valve.

Close it after 5 seconds, and check for gas leakage.

.

s

d

o

e

v

l

a

v

 

d

n

a

 

e

r

a

 

 

s

'ti

n

u

 r

o

o

d

t

u

o

 

d

n

a

 

e

r

a

 

 

s

'ti

n

u

 r

o

o

d

n

m

o

rf

 

e

g

a

k

a

e

s

a

g

 r

o

k

c

e

h

c

 ,

r

e

t

a

w

 

y

p

a

o

s

 

g

n

i

s

U

 

Wipe off all the water after completing the check.

e

c

i

v

r

e

s

 

s

a

g

 

d

n

a

 

d

i

u

q

il

 

n

e

p

o

 

y

ll

u

d

n

a

 t

r

o

p

 

e

c

i

v

r

e

s

 

s

'

e

v

l

a

v

 

e

c

i

v

r

e

s

 

s

a

g

 

m

o

rf

 

e

s

o

h

 

g

n

i

g

r

a

h

c

 t

c

e

n

n

o

c

s

i

D

  

)

7

(

valves. (Do not attempt to turn valve rod beyond its stop.)

.

w

o

l

e

b

 

e

l

b

a

e

h

n

n

w

o

h

s

 

e

u

q

r

o

d

e

 

i

c

e

p

s

 

e

h

o

p

a

c

 t

r

o

p

 

e

c

i

v

r

e

s

 

d

n

a

 

s

p

a

c

 

e

v

l

a

v

 

e

c

i

v

r

e

s

 

n

e

t

h

g

i

 )

8

(

Service valve size (mm)

Service valve cap tightening 

torque (N·m)

Service port cap tightening 

torque (N·m)

6.35 (1/4")

20-30

10-12

9.52 (3/8")

12.7 (1/2")

25-35

Charge hose

Handle Lo

Valve cap

Liquid service valve

Gas service valve

Service port

Compound pressure gauge

Pressure gauge

Gauge manifold

Handle Hi

Vacuum pump

 CAUTION

To prevent vacuum pump oil from entering into the refrigerant system, use a counter

 ow prevention adapter. 

5. Additional refrigerant charge

Additional refrigerant charge is required only when connecting pipe length exceeds 15 m.

5.1 Calculating additional refrigerant charge

Additional refrigerant charge can be calculated using the formula given below.

Additional refrigerant charge (g) = { Connecting pipe length (m) – Factory charged length 15 (m) } x 20 (g/m)

NOTE

• If additional refrigerant charge calculation result is negative, there is no need to remove the refrigerant.

• If refrigerant recharge is required for the unit with connecting pipe length 15m or shorter, charge the 

factory charged amount as shown in the table below.

• The maximum refrigerant charge amount is designed as shown in the table below. 

Model SRC 20/25/35

Model SRC40/50/60

The factory refrigerant charge amount(kg)

1.20

1.30

The maximum refrigerant charge amount(kg)

1.40

1.60

5.2 Charging refrigerant

(1) Charge the R32 refrigerant in liquid phase from service port with both liquid and gas service valves 

shut. Since R32 refrigerant must be charged in the liquid phase, make sure that refrigerant is dis-

charged from the cylinder in the liquid phase all the time.

(2) When it is dif

 cult to charge a required refrigerant amount, fully open both liquid and gas service 

valves and charge refrigerant, while running the unit in the cooling mode. When refrigerant is

charged with the unit being run, complete the charge operation within 30 minutes.

(3) Write the additional refrigerant charge calculated from the connecting pipe length on the label at-

tached on the service cover.

 CAUTION

• Running the unit with an insuf

 cient quantity of refrigerant for a long time can cause unit malfunction.

• Do not charge more than the maximum refrigerant amount. It can cause unit malfunction.

5. UTILIZATION OF EXISTING PIPE

(1) Check whether an existing pipe system is reusable or not by using the following fl

 ow chart.

Repair is impossible.

Air tightness is 

impossible.

Repair is impossible.

Repair

Air tightness is OK.

Repair

Repair

NO

NO

NO

NO

NO

NO

NO

Are the outdoor and indoor units connected to the existing pipe system ?

Does the existing unit use any of the following refrigerant oils ?

Suniso, MS,Barell Freeze, HAB, Freol, ether oil, ester oil.

Do the existing pipe specifi cations (pipe length, pipe size and elevation difference between indoor and outdoor unit) conform to the restric-

tion of the unit.? (Go to 4.CONNECTING PIPING WORK and check 1.Restrictions on unit installation and 2.Preparation of connecting pipe.)

Is the existing pipe system free of gas leaks?

(Check whether refrigerant charge was required 

frequently for the system before.)

Is the existing pipe system free of corrosion, fl aws and dents?

Are heat insulation materials of the existing pipe system 

free of peel-off or deterioration?

(Heat insulation is necessary for both gas and liquid pipes.)

Is the existing piping system free of any loose pipe support ?

The existing pipe system is reusable.

The existing pipe system is not reusable. 

Install the new pipe system.

Repair the damaged parts.

Check the pipe system for air tightness.

Repair the damaged parts.

Repair the loose pipe support.

NO

Is it possible to run the unit ?

YES

YES

YES

YES

YES

YES

YES

YES

NOTE

• Consult with our distributor in the area, if you need to recover refrigerant and charge it again.

(2) Clean the existing pipe system according to the procedure given below.

(a) Carry out forced cooling operation of existing unit for 30 minutes.

For ‘Forced cooling operation’ refer to the indoor unit installation manual.

(b) Stop the indoor fan and carry out forced cooling operation for 3 minutes (Liquid return).

(c)  Close the liquid service valve of the outdoor unit and carry out pump down operation (Refer to 6. 

PUMP DOWN).

(d) 

 

e

h

y

b

 

d

e

g

r

a

h

c

s

i

d

 

s

r

e

tt

a

m

 

n

g

i

e

r

o

y

n

a

 r

o

 l

i

o

 

n

o

it

a

r

e

g

ir

f

e

r

 

d

e

r

o

l

o

c

s

i

d

 f

.

s

a

g

 

n

e

g

o

rt

i

n

 

h

ti

w

 

w

o

l

B

 

blow, wash the pipe system or install a new pipe system.

(3) Remove the 

 are nuts from the existing pipe system. Go back to 4.CONNECTING PIPING WORK 

and proceed to step 2.2 Cutting connecting pipe.

 CAUTION

 )

w

e

n

e

h

h

ti

w

 

d

e

il

p

p

u

s

 

s

t

u

n

 

e

r

a

 

 

e

h

t

a

h

e

r

u

s

 

e

k

a

M

 .

)t

i

n

u

 

g

n

it

s

i

x

e

 f

o

s

t

u

n

 

e

r

a

 

 

d

l

o

 

e

h

e

s

u

 t

o

n

 

o

D

  

outdoor unit are used.

 

s

i

h

n

e

h

m

o

o

e

s

u

o

h

 

e

h

e

d

i

s

n

d

e

t

a

c

o

s

ti

n

u

 r

o

o

d

n

e

h

o

n

o

it

c

e

n

n

o

c

 

n

o

i

s

s

e

r

p

m

o

c

 /

 

d

e

r

a

 

 

e

h

fI 

 •

pipework can’t be reused.

* If the existing piping is speci

 ed as liquid pipe ø9.52 or gas pipe ø12.7, refer to the following. (SRC40,50

and 60 only)

<Table of pipe size restrictions>

Additional charge volume per meter of pipe

0.054kg/m

Pipe size

Liquid pipe

ø9.52

Gas pipe

ø12.7

Maximum one-way pipe length

10

Length covered without additional charge

5

Additional charge amount (kg) = {Main pipe length (m) - Length covered without additional

charge shown in the table (m)} X Additional charge amount per meter of pipe shown in the table (kg/m)

6. PUMP DOWN

(1) Connect charge hose of gauge manifold to service port of outdoor unit.

(2) Close the liquid service valve with hexagonal wrench key.

(3) Fully open the gas service valve with hexagonal wrench key.

(4) Carry out forced cooling operation (For forced cooling operation procedure, refer to indoor unit installation 

manual).

(5) When the low pressure gauge becomes 0.01MPa, close the gas service valve and stop forced cooling

operation.

7. ELECTRICAL WIRING WORK 

 WARNING

• Make sure that all the electrical work is carried out in accordance with the national or regional electri-

cal standards.

• Make sure that the earth leakage breaker and circuit breaker of appropriate capacities are installed 

  (Refer to the table given below).

• Do not turn on the power until the electrical work is completed.

• Do not use a condensive capacitor for power factor improvement under any circumstances. 

  (It does not improve power factor. Moreover, it can cause an abnormal overheat accident).

Breaker specifications

Model

SRC20/25/35

SRC40/50/60

Main fuse specification

Model

SRC20/25/35

250V 15A

SRC40/50/60

250V 20A

1.Preparing cable

(1) Selecting cable

Select the power source cable and connecting cable in accordan

(a) Power source cable

3 cores* 2.5mm

When selecting the power source cable  length, make sure that voltage drop is less than 2%.

If the wire length gets longer, increase the wire diameter.

(b) Connecting cable

4 cores* 1.5mm

* 1 Earth wire is included (Yellow/Green).

(2) Arrange each wire length as shown below.

Make sure that each wire is stripped 10mm from the end.

<Power source cable>

Earth wire

30mm or more

(3) Attach round crimp-type terminal to each wire as shown in the below.

Select the size of round crimp-type terminal  after considering the 

specifications

 of terminal block and wire 

diameter.

10mm

CAUTION

Power source cable and connecting cable must conform to the spe

Using cables with wrong specifi

8. FINISHING WORK

1. Heating and condensation prevention

(1) Dress the connecting pipes (both liquid and gas pipes) with insulation to prevent it from heating

and dew condensation. 

Use the heat insulating material which can withstand 120°C or higher temperature. Make sure that 

insulation is wrapped tightly around the pipes and no gap is left between them. 

(2) Wrap the refrigerant pipings of indoor unit with indoor unit heat insulation using tape. 

(3) Cover the 

flare-connected

 joints (indoor side) with the indoor unit heat insulation and wrap it with 

an insulation pad (standard accessory provided with indoor unit). 

(4) Wrap the connecting pipes, connecting cable and drain hose with the tape.

(2)

Tape

NOTE

Locations where relative humidity exceeds 70%, both liquid and gas pipes need to be dressed with 20mm 

thicker heat insulation materials.

CAUTION

• Improper insulation can cause condensate(water) formation during cooling operation. 

Condensate can leak or drip causing damage to household property.

• Poor heat insulating capacity can cause pipe outer surface to reach high temperature during heating 

operation. It can cause cable deterioration and personal injury. 

9. INSTALLATION TEST CHECK POINTS

After fi

nishing the installation work, check the following points again before turning on the power

Conduct test run (Refer to indoor unit installation manual) and ensure that the unit operates properly. 

Power source voltage complies with the rated voltage of air-conditioner.
Earth leakage breaker and circuit breaker are installed.
Power cable and connecting cable are securely 

xed to the terminal block.

Both liquid and gas service valves are fully open.

’20

SRF-DB-310D

'20 • SRF-DB-310

-

 41 

-

Summary of Contents for SRC20ZS-W

Page 1: ...f the power source in the event of installation mainte nance or service If the power source is not switched off there is a risk of electric shock unit failure or personal injury Be sure to tighten the cables securely in terminal block and relieve the cables properly to prevent overloading the terminal blocks Loose connections or cable mountings can cause anomalous heat production or fire Do not pr...

Page 2: ... or snow accumulation the fol lowing measures are required 1 Location of strong wind Place the unit with its outlet side facing the wall Place the unit such that the direction of air from the outlet gets perpendicular to the wind direction Over 500mm Wind direction Wind direction 2 Location of snow accumulation Install the unit on the base so that the bottom is higher than snow cover surface Insta...

Page 3: ...charge can be calculated using the formula given below Additional refrigerant charge g Connecting pipe length m Factory charged length A m x 20 g m Model SRK SRR SRF35 FDTC Model SRF25 A Factory charged length m 15 10 NOTE If additional refrigerant charge calculation result is negative there is no need to remove the refrigerant If refrigerant recharge is required for the unit with connecting pipe ...

Page 4: ... may work on terminal connec tions Moreover make sure that cables do not touch the piping etc When cables are connected make sure that all electrical components within the electrical component box are free of loose connector coupling or terminal connection Circuit diagram N L 1 2 N 3 1 2 N 3 Circuit breaker Earth leakage breaker Earth Power source Indoor unit Outdoor unit Connecting cable Power so...

Page 5: ... power source is not switched off there is a risk of electric shock unit failure or personal injury a c e h t e v e i l e r d n a k c o l b l a n i m r e t n i y l e r u c e s s e l b a c e h t n e t h g i t o t e r u s e B bles properly to prevent overloading the terminal blocks Loose connections or cable mountings can cause anomalous heat production or fire h t i w t e k c o s e h t e r a h s r o...

Page 6: ...d out 1 Install drain elbow and drain grommet l a i r e t a m g n i k l u a c e t a u q e d a r o y t t u p h t i w t e m m o r g n i a r d d n a w o b l e n i a r d e h t d n u o r a l a e S 2 SRC20 25 35 40 50 60ZSX W Do not put a grommet on this hole This is a supplementary drain hole to discharge drain water when a large amount of it is gathered CAUTION Do not use drain elbow and drain grommet...

Page 7: ...ressure gauge Pressure gauge Gauge manifold Handle Hi Vacuum pump CAUTION To prevent vacuum pump oil from entering into the refrigerant system use a counterflow prevention adapter 5 Additional refrigerant charge Additional refrigerant charge is required only when connecting pipe length exceeds 15 m 5 1 Calculating additional refrigerant charge Additional refrigerant charge can be calculated using t...

Page 8: ...embly should be anchored ev ery 1 5m or less to isolate the vibration 3 Install the service cover securely Water may enter the unit if service cover is not installed properly resulting in unit malfunction and failure Pipe assembly Screw Clamp CAUTION Improper insulation can cause condensate water formation during cooling operation Condensate can leak or drip causing damage to household property Po...

Page 9: ...oor unit shall be stored in a room that has a minimum area of 4 0 m2 D WARNING RSA012A061B WALL TYPE AIR CONDITIONER R32 REFRIGERANT USED is leaked together with an external ignition source there is a possibility of ignition There is information included in the user s manual and or installation manual The user s manual should be read carefully A service personnel should be handing this equipment w...

Page 10: ...ts are recovered safely Prior to the task being carried out an oil and refrigerant sample shall be taken in case analysis is required prior to re use of reclaimed refrigerant It is essential that electrical power is available before the task is commenced a Become familiar with the equipment and its operation b Isolate system electrically c Before attempting the procedure ensure that mechanical han...

Reviews: