-
85
-
Note (1) When outdoor unit heat exchanger sensor (Th4) temperature becomes 2
°
C or higher, inverter command changes 70 rps to 40
rps.
(iii) Ending conditions (Operation returns to the heating cycle when either one of the following is met.)
1
Outdoor heat exchanger sensor (Th4) temperature: 15ºC or higher
2
Continued operation time of defrosting
→
For more than 10 min.
(e)
Heating “HIGH POWER” operation
(HI POWER button on remote controller: ON)
Operation is maintained for 15 minutes with a higher blow out air temperature.
¡
Detail of operation
Model
SRK63ZE-S1
SRK71ZE-S1
Item
Inverter command speed
88 rps
95 rps
Indoor fan motor
Hot keep M mode (max 10th speed)
Outdoor fan motor
6th speed
Notes (1) Room temperature is not adjusted during the HIGH POWER operation.
(2) Protective functions will actuate with priority even during the HIGH POWER operation.
indoor unit
Hot keep
120sec.
120sec.
40sec. 40sec.
Final defrost operation
Defrost
operation
(1)
Defrost end (Th4 15
°
C ,10 min.)
Hot keep
outdoor unit
Indoor fan
motor
Outdoor fan
motor
4-way valve
RUN light
Inverter
command
OFF
ON
ON
Corresponding
to speed
OFF
OFF
Corresponding
to speed
Defrost operation
preparation
Normal heating operation restored
Flashing
(Hot keep)
Fuzzy calculated
value
0
70rps
(ii)
Operation of functional components during defrosting operation
Summary of Contents for SRK56CE-S1
Page 138: ... 136 MEMO ...
Page 262: ... 260 MEMO ...