-
68
-
'19 • SCM-SM-276
(3) Defrost operation
(a) Starting conditions
(i)
(ii)
(iii)
(iv)
−
40
40
finish
Tho-R1
satisfied
The difference between the outdoor air sensor temperature (Tho-A) and outdoor heat
exchanger sensor temperature (Tho-R1) is as following.
2 or less
Max. 10 minutes
Defrost operation
Heating operation
※
Depends on an operation condition, the time can be longer than 7 minutes.
2~7 minutes
※
Hot keep operation
-20
-20
-15
-10
-5
0
5
10
-15
-10
-5
0
Outdoor air temperature (
℃
)
Outdoor heat exchanger temperature (
℃
)
Defrost operation
start
Defrost operation start temperature
: After 150 minutes
: Less than 150 minutes
Accumulated compressor operation time
−
−
(i)
(ii)
Tho-R
Tho-R1
2
2
13
10
(v)
(i) (ii) (iii)
(v)
(b) Ending conditions
Max. 10 minutes
Defrost operation
Heating operation
※
Depends on an operation condition, the time can be longer than 7 minutes.
2~7 minutes
※
Hot keep operation
-20
-20
-15
-10
-5
0
5
10
-15
-10
-5
0
Outdoor air temperature (
℃
)
Outdoor heat exchanger temperature (
℃
)
Defrost operation
start
Defrost operation start temperature
: After 150 minutes
: Less than 150 minutes
Accumulated compressor operation time
(v)
In case satisfied all of following conditions.
• Connect compressor speed 0 rps 10 times or more
.
• Satisfy i), ii) and iii) conditions above
.
• Outdoor air temperature is 3°C or less
.
Summary of Contents for SRK60ZSX-W
Page 2: ......