-
61
-
'19 • PAC-SM-332
Model FDC71VNX-W
1) Replace the PCB
after elapsing 3 minutes from power OFF.
(Be sure to measure voltage (DC)
between T26 and T27 on inverter PCB, and
check that the
voltage is discharged sufficiently(10V or less)
.(Refer to Fig.2))
2) Disconnect the connectors from the control PCB.
3) Match the switches setting (SW4) with the former PCB.
4) Connect the connectors to the control PCB.(Confirm the
connectors are not half inserted
.)
After elapsing 3 minutes
from power OFF
Connectors are not
half inserted
Fig.1 Parts arrangement view
Fig.2 Position of terminal
Voltage measurement point
(T26
(red)
㸪
T27 (blue))
CNG1
CNI1
CNI3
CNB
CNE
CNW2
CNDRM
CNA2
CNA1
LED1
(Back side)
LED2
(Back side)
CNN1
CNEEV1
CNS
CNN2
CNFAN
CNEEV2 CNPS
CNQ1
CNQ2
SW4
CNW CNH
CNR
Parts No.
CNV
&17+
CNZ
*
Presence and shape of electric component may
vary according to model.
PCA012D049A
A
Model FDC71VNX-W
1) Replace the PCB
after elapsing 3 minutes from power OFF.
(Be sure to measure voltage (DC)
between T26 and T27 on inverter PCB, and
check that the
voltage is discharged sufficiently(10V or less)
.(Refer to Fig.2))
2) Disconnect the connectors from the control PCB.
3) Match the switches setting (SW4) with the former PCB.
4) Connect the connectors to the control PCB.(Confirm the
connectors are not half inserted
.)
After elapsing 3 minutes
from power OFF
Connectors are not
half inserted
Fig.1 Parts arrangement view
Fig.2 Position of terminal
Voltage measurement point
(T26
(red)
㸪
T27 (blue))
CNG1
CNI1
CNI3
CNB
CNE
CNW2
CNDRM
CNA2
CNA1
LED1
(Back side)
LED2
(Back side)
CNN1
CNEEV1
CNS
CNN2
CNFAN
CNEEV2 CNPS
CNQ1
CNQ2
SW4
CNW CNH
CNR
Parts No.
CNV
&17+
CNZ
*
Presence and shape of electric component may
vary according to model.
Model FDC71VNX-W
1) Replace the PCB
after elapsing 3 minutes from power OFF.
(Be sure to measure voltage (DC)
between T26 and T27 on inverter PCB, and
check that the
voltage is discharged sufficiently(10V or less)
.(Refer to Fig.2))
2) Disconnect the connectors from the control PCB.
3) Match the switches setting (SW4) with the former PCB.
4) Connect the connectors to the control PCB.(Confirm the
connectors are not half inserted
.)
After elapsing 3 minutes
from power OFF
Connectors are not
half inserted
Fig.1 Parts arrangement view
Fig.2 Position of terminal
Voltage measurement point
(T26
(red)
㸪
T27 (blue))
CNG1
CNI1
CNI3
CNB
CNE
CNW2
CNDRM
CNA2
CNA1
LED1
(Back side)
LED2
(Back side)
CNN1
CNEEV1
CNS
CNN2
CNFAN
CNEEV2 CNPS
CNQ1
CNQ2
SW4
CNW CNH
CNR
Parts No.
CNV
&17+
CNZ
*
Presence and shape of electric component may
vary according to model.