'20 • SR-SM-285
-
40
-
(1) Defrost operation
(a) Starting conditions (Defrosting operation can be started only when all of the following conditions are satisfied.)
1) After start of heating operation
When it elapsed 35 minutes. (Accumulated compressor operation time)
2) After end of defrosting operation
When it elapsed 35 minutes. (Accumulated compressor operation time)
3) Outdoor heat exchanger sensor (TH2) temperature
When the temperature has been below –5ºC for 3 minutes continuously.
4) The difference between the outdoor air sensor temperature and the outdoor heat exchanger sensor temperature
¡
The outdoor air temperature
≧
0°C : 7°C or higher
¡
-15°C
≦
The outdoor air temperature
<
0°C : 3/15 × The outdoor air tempe 7°C or higher (FDTC25)
4/15 × The outdoor air tempe 7°C or higher (FDTC35)
¡
The outdoor air temperature < -15°C : -5°C or higher
5) During continuous compressor operation
In addition, when the speed command from the indoor control of the indoor unit during heating operation has counted
0 rps 10 times or more and all conditions of 1), 2) and 3) above and the outdoor air temperature is 3°C or less are satis-
fied (note that when the temperature for outdoor heat exchanger sensor (TH2) is -5°C or less: 62 rps or more, -4°C or
less: less than 62 rps), defrost operation is started.
(b) Ending conditions (Operation returns to the heating cycle when either one of the following is satisfied.)
1) Outdoor heat exchanger sensor (TH2) temperature: 13ºC or higher
2) Continued defrost operation time → For more than 15 minutes
Max. 15 minutes
Heating operation
¡
Defrost operation
ͤ
Depends on an operation condition, the time can be longer than 7 minutes.
2-7 minutes
ͤ
Hot keep operation
1.2.4 Operation control function by the outdoor control
-20
-20
-15
-10
-5
0
5
10
-15
-10
-5
0
Outdoor air temperature (
℃
)
Outdoor heat exchanger temperature (
℃
)
-20
-20
-15
-10
-5
0
5
10
-15
-10
-5
0
Outdoor air temperature (
℃
)
Outdoor heat exchanger temperature (
℃
)
Defrost operation
start
Defrost operation
start
Defrost operation start temperature
Defrost operation start temperature
Models 20
~
35
Model 50
FDTC25
FDTC35
Outdoor air temperature (°C)
37 38
40 41
OFF
ON1
ON2
Outdoor air temperature (°C)
40 41
46 47
OFF
ON1
ON2
46 47
ON3
(2) Cooling overload protective control
(a) Operating conditions
Outdoor air temperature
Lower limit speed
When the outdoor air temperature (TH3) has become continuously for 30 seconds at 41°C or more, or
47ºC or more with the compressor running, the lower limit speed of compressor is brought up.
45
-20
-20
-15
-10
-5
0
5
10
-15
-10
-5
0
Outdoor air temperature (
℃
)
O
ut
do
or
h
ea
t e
xc
ha
ng
er
te
m
pe
ra
tu
re
(
℃
)
-20
-20
-15
-10
-5
0
5
10
-15
-10
-5
0
Outdoor air temperature (
℃
)
O
ut
do
or
h
ea
t e
xc
ha
ng
er
te
m
pe
ra
tu
re
(
℃
)
Defrost operation
start
Defrost operation
start
De
fro
st
op
era
tio
n s
tar
t t
em
pe
rat
ur
e
De
fro
st
op
era
tio
n s
tar
t t
em
pe
rat
ur
e
Models 20
~
35
Model 50
Summary of Contents for SRR25ZS-W
Page 79: ... 20 SR SM 285 78 ...