Pre-removal
and Post-installation
I
Operation
l
Draining and Refilling of Differential
Oil (Refer to
l
Removai and installation of
haust Pipe (Refer to GROUP
Exhaust
and Main Muffler.)
Gear
19-28 Nm
27-26
AXLE
Differential Carrier
DIFFERENTIAL CARRIER
REMOVAL AND INSTALLATION
72-87
14-21 Nm
9-14
72-87
I
-
-
Revision
I
Nm
90-70
43-51
Nm
22-25
1
Removal steps
1. Drive shaft (Refer to
2.
3. Propeller shaft connection
(Refer to GROUP
Shaft)
4. Feed tube (Vehicles with
5. O-ring (Vehicles with
6. Rear oil pump (Vehicles with
7. O-ring (Vehicles with
8.
support member installation
9. Stopper
10.
support member installation
11. Dynamic damper 990 models)
12. Differential support member
13.
support member installation
14. Differential carrier
Summary of Contents for 1989 Galant
Page 2: ......
Page 4: ...00 z NOTES ...
Page 274: ...13 132 NOTE ...
Page 586: ...NOTES ...
Page 650: ...NOTE ...
Page 664: ...NOTES ...
Page 688: ...NOTES ...
Page 690: ......
Page 692: ......
Page 694: ......
Page 696: ......
Page 698: ......
Page 700: ...c ...
Page 702: ......
Page 704: ......
Page 706: ......
Page 708: ......
Page 710: ......
Page 712: ......
Page 714: ......
Page 716: ......
Page 718: ......
Page 720: ......
Page 722: ......
Page 724: ......
Page 729: ...23 23 NOTES ...
Page 860: ...NOTES ...
Page 921: ...NOTES ...
Page 948: ...33B 9 NOTES ...
Page 1121: ...NOTES ...
Page 1200: ...SERVICE BRAKES Brake Pedal 35 79 Lubrication points Part A 14AO256 1 14UOO5l TSB Revision ...
Page 1273: ...NOTES t ...