6 Hardware Settings
6-20 Module Mounting Procedures
6. Hardware Settings
6.1. Module Mounting Procedures
The example of installing the CC-
Link IE Field
module on the network base card (
2F
-DQ
535) is shown
below.
(1)
Prepare the network base card (2F
-DQ
535),
CC-
Link IE Field
module and module fixing parts.
Remove the card handle fixing screws from the network base card (
2F
-DQ
535), and separate the
card from the card handle.
(2)
Insert the pro
trusions on the module fixing parts (bottom side) into the holes on the card.
CC-Link IE Field
Network base card
Card handle
CC-
Link IE Field
Module fixing parts
Fixing part (top side)
Fixing part
(bottom side)
Module fixing parts (bottom side)