![background image](http://html1.mh-extra.com/html/mitsubishi/engine-cooling/engine-cooling_workshop-manual_1809104020.webp)
ENGINE COOLING -
Water Hose and Water Pipe
14-20
<6A1>
Pre-removal and Post-installation Operation
D
Engine Coolant Draining and Supplying
(Refer to P.14-10.)
D
Air Cleaner and Air Intake Hose Assembly Removal
and Installation
D
Distributor Removal and Installation
(Refer to GROUP 16.)
10 - 12 Nm
22 - 25 Nm
27 - 33 Nm
22 Nm
39 Nm
12 - 15 Nm
22 - 25 Nm
12 - 15 Nm
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Removal steps
1. Control wiring harness mounting
bolt
2. Spark plug cable clamp mounting
bolt
A
A
" "
C
A
3. Radiator upper hose connection
A
A
" "
C
A
4. Radiator lower hose connection
5. Engine coolant temperature sensor
connector
6. Engine coolant temperature gauge
unit connector
7. Water hose
8. Water hose
9. Heater hose connection
10. Heater pipe assembly
"
A
A
11. O-ring
12. Water hose
13. Thermostat case assembly
"
A
A
14. O-ring
15. Water inlet pipe assembly
"
A
A
16. O-ring
17. Water hose
18. Water pipe assembly
19. Water pipe joint
Summary of Contents for Engine cooling
Page 26: ...NOTES ...