Communication connectors and terminals
53
2
2.8
Communication connectors and terminals
2.8.1
PU connector
Mounting the operation panel or parameter unit
• With a connection cable, the operation panel or the parameter unit can be connected to the inverter.
(A connection connector is also required for connecting the operation panel.)
Use the option FR-CB2[] cable (and FR-ADP connector), or a cable and connector available on the market.
Securely insert both ends of the connection cable until the stoppers are fixed.
• If the operation panel is removed from the inverter, the inverter does not conform to IP55.
NOTE
• Refer to the following table when fabricating the cable on the user side. Keep the total cable length within 20 m.
• Commercially available products (as of February 2015)
Communication operation
• Using the PU connector enables communication operation from a personal computer, etc. When the PU connector is
connected with a personal, FA or other computer by a communication cable, a user program can run to monitor the inverter
or read and write parameters.
Communication can be performed with the Mitsubishi inverter protocol (computer link operation).
For the details, refer to the FR-F800 Instruction Manual (Detailed).
• If the operation panel is removed from the inverter, the inverter does not conform to IP55.
STF FWD PU
Parameter unit connection cable
(FR-CB2[ ]) (option)
Parameter unit
(FR-PU07) (option)
Operation panel connection connector
(FR-ADP) (option)
Operation panel
(FR-LU08-01)
Name
Remarks
Communication cable
Cable compliant with EIA-568 (such as 10BASE-T cable)