10-6
11723
11725
11724
Removal and Installation of Engine
REMOVAL AND INSTALLATION OF ENGINE
●
Removal sequence
1 Bolt
2 Nut
3 Engine assembly
WARNING
–
When you lift engine assembly 3, you must use lifting gear that is strong enough to lift the mass of the engine
(approximately 550 kg {1210 lb}).
●
Installation sequence
Follow the removal sequence in reverse.
2
1
Summary of Contents for FUSO FH 1997
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ...Group 00 General Pub No TWME9502 00 Table of Contents BACK HOME...
Page 14: ...00 5 00 M E M O...
Page 26: ...00 17 00 M E M O...
Page 30: ...00 21 00 M E M O...
Page 38: ...00 29 00 Model Number shows number of pins Connection AJ16A AJ...
Page 40: ...00 31 00 Model Number shows number of pins Connection AK 8 A AK10A AK14A AK18A AK20A AK...
Page 52: ...BACK HOME...
Page 53: ...98 Minor Change Group 01 Maintenance Schedule Pub No TWME9502 201 Table of Contents BACK HOME...
Page 94: ...01 41 01 M E M O...
Page 96: ...01 43 01 Door hinge 01518...
Page 97: ...Table of Contents BACK HOME...
Page 120: ...01 23 01 M E M O...
Page 140: ...01 43 01 Door hinge 01518...
Page 141: ...Group 10 Removal and Installation of Engine Pub No TWME9502 10 Table of Contents BACK HOME...
Page 149: ...Group 11 Engine Pub No TWME9502 11 Table of Contents BACK HOME...
Page 200: ...11 51 11 M E M O...