6 - 12
6.5 Installation Procedure
4.
Place the mounting fixtures (included with GOT) on the mounting fixture attaching part of the GOT, and fix them by
tightening the mounting screws in the torque range of 0.36 to 0.48N·m.
(Failure to do so may distort the panel and make a surface waviness on the protective sheet.)
5.
A protection film is attached on the display section of GOT prior to shipment.
Remove the film when the installation is compelted.
Remove the protective film of the GOT.
When the user continues using the GOT with the protective film, the film may not be removed.
POINT
POINT
POINT
Precautions after battery connection
Make sure to turn on the GOT power supply once upon completion of battery connection. Failure to do somay
decrease the battery life.
Magnified figure
For GT1695: Fix the GOT with 8 mounting fixtures.
For other then GT1695: Fix the GOT with 4 mounting fixtures.
Magnified figure
Summary of Contents for GOT 1000 GT16
Page 1: ...GT16 User s Manual Hardware ...
Page 2: ......
Page 14: ...A 12 INDEX REVISIONS WARRANTY ...
Page 210: ...App 17 ...
Page 212: ...Index 2 Transportation Precautions App 15 U USB environmental protection cover 2 17 8 19 ...
Page 217: ......