6.3 Mounting Position
6 - 3
1
OV
E
R
VI
EW
2
SYSTE
M
CO
N
F
IG
UR
A
T
IO
N
3
S
P
E
CI
F
ICA
T
ION
S
4
P
A
R
T
NA
ME
AND
SETTING
S
5
EMC AND
LO
W
VO
LT
AG
E
DIRE
C
T
IVE
6
IN
ST
ALLA
TIO
N
7
WIRING
8
OP
TI
ON
6.3 Mounting Position
For installing GOT
When mounting the GOT, the following clearances must be left from the other device.
Depending on the units and cables connected to the GOT, clearances more than the described dimensions can be
required.
Therefore, consider the connector dimensions and bending radius of the cable as well for installation.
For the lead-in allowance for cables at the bottom of the GOT, refer to the following.
B
A
C
E
D
Panel thickness:
2 to 4mm
(0.08 to 0.16inch)
Summary of Contents for GOT 1000 GT16
Page 1: ...GT16 User s Manual Hardware ...
Page 2: ......
Page 14: ...A 12 INDEX REVISIONS WARRANTY ...
Page 210: ...App 17 ...
Page 212: ...Index 2 Transportation Precautions App 15 U USB environmental protection cover 2 17 8 19 ...
Page 217: ......