7 - 10
7.6 Grounding Extension Units
7.6 Grounding Extension Units
7.6.1
Wiring FG cable of bus connection cable
This section describes wiring of the FG cable when a PLC CPU is connected to the GOT.
POINT
POINT
POINT
Cable connected to the PLC CPU
Do not install the connection cable together with the main circuit lines (high voltage, large current) or I/O signal
lines.
When connecting QCPU or motion controller CPU (Q series) to the GOT
Grounding of the FG cable for QCPU and motion controller CPU (Q series) is not necessary since they have no FG
wire.
When connecting QnACPU, ACPU, or motion controller CPU (A series) to the GOT
When using GT15-C
EXSS-1 or GT15-C
BS, perform the grounding in the following steps.
POINT
POINT
POINT
(1) GOT terminal block
The terminal block layout of a GOT differs depending on the model.
Before wiring, check the terminal layout of the GOT to be used.
(2) Ground cables
Up to two ground cables can be connected to the LG and FG terminals of the GOT respectively.
For three or more ground cables, connect the third or later ground cables to the LG terminal.
Summary of Contents for GOT 1000 GT16
Page 1: ...GT16 User s Manual Hardware ...
Page 2: ......
Page 14: ...A 12 INDEX REVISIONS WARRANTY ...
Page 210: ...App 17 ...
Page 212: ...Index 2 Transportation Precautions App 15 U USB environmental protection cover 2 17 8 19 ...
Page 217: ......