© Mitsubishi Forklift Trucks 2013. All
© Mitsubishi Forklift Trucks 2013. All
rights reserved.
rights reserved.
Revision: B
Revision: B
Document ID: 615023
Document ID: 615023
55 (244)
55 (244)
PBV20N2
PBV20N2
Service
Service Manual
Manual
3.
3.
Wet the new wheel shaft bolt
Wet the new wheel shaft bolt with
with
Loctite 243.
Loctite 243.
4.
4.
Install the new wheel shaft bolt.
Install the new wheel shaft bolt.
5.
5.
Tighten the new wheel shaft bolt.
Tighten the new wheel shaft bolt.
The correct tightening torque is
The correct tightening torque is
27 Nm.
27 Nm.
5.9.2
5.9.2
Assembly
Assembly of
of the
the traction
traction wheel
wheel
1.
1.
Align the rim’
Align the rim’s hole pattern
s hole pattern with the
with the
wheel shaft bolts and slide the
wheel shaft bolts and slide the
traction wheel into place.
traction wheel into place.
2.
2.
Install the five rounded cone nuts
Install the five rounded cone nuts
and tighten them. The correct
and tighten them. The correct
tightening torque for the nuts is
tightening torque for the nuts is
80 Nm.
80 Nm.
https://www.forkliftpdfmanuals.com/