The maintenance and inspection procedures to be carried out to use the robot for a long time without trouble are
The maintenance and inspection procedures to be carried out to use the robot for a long time without trouble are
The maintenance and inspection procedures to be carried out to use the robot for a long time without trouble are
The maintenance and inspection procedures to be carried out to use the robot for a long time without trouble are
described in this chapter. The types and replacement methods of consumable parts are also explained.
described in this chapter. The types and replacement methods of consumable parts are also explained.
described in this chapter. The types and replacement methods of consumable parts are also explained.
described in this chapter. The types and replacement methods of consumable parts are also explained.
5.
1
Maintenance and inspection interval
5.
1
Maintenance and inspection interval
5.
1
Maintenance and inspection interval
5.
1
Maintenance and inspection interval
Maintenance and inspection are divided into the inspections carried out daily, and the periodic inspections carry
Maintenance and inspection are divided into the inspections carried out daily, and the periodic inspections carry
Maintenance and inspection are divided into the inspections carried out daily, and the periodic inspections carry
Maintenance and inspection are divided into the inspections carried out daily, and the periodic inspections carry
out at set intervals. Always carry these out to prevent unforeseen trouble, to maintain the product for a long time,
out at set intervals. Always carry these out to prevent unforeseen trouble, to maintain the product for a long time,
out at set intervals. Always carry these out to prevent unforeseen trouble, to maintain the product for a long time,
out at set intervals. Always carry these out to prevent unforeseen trouble, to maintain the product for a long time,
and to secure safety.
and to secure safety.
and to secure safety.
and to secure safety.
(
1
) Inspection schedule
(
1
) Inspection schedule
(
1
) Inspection schedule
(
1
) Inspection schedule
In addition to the monthly inspection, add the following inspection items every three months (estimated at 500 Hr
In addition to the monthly inspection, add the following inspection items every three months (estimated at 500 Hr
In addition to the monthly inspection, add the following inspection items every three months (estimated at 500 Hr
In addition to the monthly inspection, add the following inspection items every three months (estimated at 500 Hr
operation hours).
operation hours).
operation hours).
operation hours).
Fig.5-
1 :
Inspection schedule
Fig.5-
1 :
Inspection schedule
Fig.5-
1 :
Inspection schedule
Fig.5-
1 :
Inspection schedule
0
Hr
0
Hr
0
Hr
0
Hr
DDDDa
aaaiiiil
lllyyyy
iiiin
nnns
ssspp
ppee
eec
ccct
tttiiiio
ooon
nnn
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
5 0 0
Hr
5 0 0
Hr
5 0 0
Hr
5 0 0
Hr
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
3-month inspection
3-month inspection
3-month inspection
3-month inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
1 0 0 0
Hr
1 0 0 0
Hr
1 0 0 0
Hr
1 0 0 0
Hr
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
3-month inspection
3-month inspection
3-month inspection
3-month inspection
6-month inspection
6-month inspection
6-month inspection
6-month inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
1 5 0 0
Hr
1 5 0 0
Hr
1 5 0 0
Hr
1 5 0 0
Hr
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
3-month inspection
3-month inspection
3-month inspection
3-month inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
2 0 0 0
Hr
2 0 0 0
Hr
2 0 0 0
Hr
2 0 0 0
Hr
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
3-month inspection
3-month inspection
3-month inspection
3-month inspection
6-month inspection
6-month inspection
6-month inspection
6-month inspection
Yearly inspection
Yearly inspection
Yearly inspection
Yearly inspection
1 2 0 0 0
Hr
1 2 0 0 0
Hr
1 2 0 0 0
Hr
1 2 0 0 0
Hr
Monthly inspection
Monthly inspection
Monthly inspection
Monthly inspection
3-month inspection
3-month inspection
3-month inspection
3-month inspection
6-month inspection
6-month inspection
6-month inspection
6-month inspection
6-years inspection
6-years inspection
6-years inspection
6-years inspection
<Guideline for inspection period>
<Guideline for inspection period>
<Guideline for inspection period>
<Guideline for inspection period>
For one shift
For one shift
For one shift
For one shift
8 Hr/day x 20 days/month x 3 months = approx. 500 Hr
8 Hr/day x 20 days/month x 3 months = approx. 500 Hr
8 Hr/day x 20 days/month x 3 months = approx. 500 Hr
8 Hr/day x 20 days/month x 3 months = approx. 500 Hr
1
0 Hr/day x 20 days/month x 3 months = approx. 600 Hr
1
0 Hr/day x 20 days/month x 3 months = approx. 600 Hr
1
0 Hr/day x 20 days/month x 3 months = approx. 600 Hr
1
0 Hr/day x 20 days/month x 3 months = approx. 600 Hr
For two shifts
For two shifts
For two shifts
For two shifts
1
5 Hr/day x
1
5 Hr/day x
1
5 Hr/day x
1
5 Hr/day x 20 days/month x
20 days/month x
20 days/month x
20 days/month x 3 months = approx.
1
000 Hr
3 months = approx.
1
000 Hr
3 months = approx.
1
000 Hr
3 months = approx.
1
000 Hr
[Caution] When using two lines, the 3-month inspection, 6-month inspection and yearly
[Caution] When using two lines, the 3-month inspection, 6-month inspection and yearly
[Caution] When using two lines, the 3-month inspection, 6-month inspection and yearly
[Caution] When using two lines, the 3-month inspection, 6-month inspection and yearly
inspection must be carried out when half the time has passed.
inspection must be carried out when half the time has passed.
inspection must be carried out when half the time has passed.
inspection must be carried out when half the time has passed.