CONTENTS
i
Page
Before starting use .......................................................................................................................... 1-1
Using the instruction manuals ................................................................................................... 1-1
The details of each instruction manuals ............................................................................... 1-1
Symbols used in instruction manual .................................................................................... 1-2
Safety Precautions .................................................................................................................... 1-3
Precautions given in the separate Safety Manual ................................................................ 1-4
2.1 Confirming the product ......................................................................................................................................................... 2-6
2.2 Installation .................................................................................................................................................................................. 2-7
2.2.1 Unpacking ............................................................................................................................................................................ 2-7
2.2.2 Transportation procedures(Transportation by people) .................................................................................... 2-8
2.2.3 Installation procedures .................................................................................................................................................. 2-9
2.2.4 Grounding procedures .................................................................................................................................................. 2-10
(1) CR750 controller ....................................................................................................................................................... 2-11
(2) CR751 controller ....................................................................................................................................................... 2-12
(1) Installing the T/B (CR750 controller) ............................................................................................................... 2-13
(2) Installing the T/B (CR751 controller) ............................................................................................................... 2-14
(1) Confirming the origin data ..................................................................................................................................... 2-15
(2) Turning ON the control power ............................................................................................................................. 2-15
(3) Preparing the T/B ..................................................................................................................................................... 2-16
(4) Selecting the origin setting method ................................................................................................................... 2-17
(5) Inputting the origin data ......................................................................................................................................... 2-18
(6) Installing the J1 motor cover. .............................................................................................................................. 2-19
(1) JOINT jog operation ................................................................................................................................................. 2-24
(2) XYZ jog operation ...................................................................................................................................................... 2-27
(3) TOOL jog operation .................................................................................................................................................. 2-29
(4) 3-axis XYZ jog operation ....................................................................................................................................... 2-31
(5) CYLNDER jog operation ......................................................................................................................................... 2-33
(6)
Work jog operation ......................................................................................................... 2-35
5.1 Maintenance and inspection interval ............................................................................................................................. 5-44
5.2 Inspection items ..................................................................................................................................................................... 5-45
5.2.1 Daily inspection items .................................................................................................................................................. 5-45
5.2.2 Periodic inspection ........................................................................................................................................................ 5-46
5.3.1 Robot arm structure ..................................................................................................................................................... 5-47
5.3.2 Installing/removing the cover ................................................................................................................................... 5-49
5.3.3 Inspection, maintenance and replacement of timing belt .............................................................................. 5-51
(1) Timing belt replacement period ......................................................................................................................... 5-51
(2) Inspection, maintenance and replacement of J1-axis timing belt ........................................................ 5-52
(3) Inspection, maintenance and replacement of J2-axis timing belt ........................................................ 5-54
(4) Inspection, maintenance and replacement of J3-axis timing belt ........................................................ 5-55
Summary of Contents for RV-2F Series
Page 2: ......