Document No.: E20-018-00
16
6.9.
Standard Connection Diagrams
These diagrams show the standard connections between the EJ-210 and boiler.
(1) Boiler with BL-model or XJ1-model controller mounted
Figure 6-6: Connection diagram for boiler with BL-model or XJ1-model controller mounted
(2) Boiler without BL-model or XJ1-model controller
Figure 6-8: Connection diagram for boiler without BL-model or XJ1-model controller
Boiler control box
CPU board
RY board
or
I/O board
Cable
assembly
EC11
EC11
EJ21
CPU board
EJ21
I/O board
Switching
power supply
AC input/output wiring
(procured on-site)
Boiler operation
terminal EJ-210
Boiler control box
AC input/output wiring
(procured on-site)
EJ21
I/O board
Switching
power supply
EJ21
CPU board
EC11
Boiler operation
terminal EJ-210