Document No.: E20-018-00
5
4.
REQUIRED PARTS
During installation of the EJ-210, different parts are required according to the boiler installed. Be sure
to check the following points before starting installation.
(1) Boiler with BL-model or XJ1-model controller mounted
For a boiler that has a BL-model or XJ1-model controller, communication occurs between the EJ-
210 and the boiler. The RS-422 communication conversion circuit board EC11 has to be installed
on the CPU board on the boiler side.
(2) Boiler allowing installation inside the control box
If a boiler allows the MI terminal MT1-200 to be installed inside the control box, the EJ-210 can
be installed in the same way. A setting plate and panel name plate are required for installation.
(3) Boiler without BL-model or XJ1-model controller
For a boiler that does not have a BL-model or XJ1-model controller, installation is possible using
the EJ-210 and AC input and output wiring only.