Document No.: E20-018-00
8
5.2.2.
Boiler Allowing Installation inside the Control Box
For a boiler model that allows the MI terminal MT1-200 to be installed inside the control box, the EJ-
210 can be installed in the same way. Contact a MIURA sales office for more details.
A parts kit is required to install the EJ-210 inside a control box. Contact a MIURA sales office for
more details.
5.3.
Installing RS-422 Communications Equipment
For a boiler that has a BL-model or XJ1-model controller, an RS-422 communication conversion circuit
board EC11 has to be installed in the control box.
Install the appropriate parts of the parts kit corresponding to the boiler. Contact a MIURA sales
office for more details.