MFP250 / 400 / 800
Initial Start Up
76609594EN-MFP-NH-V2.0.docx 21/40
4
Initial Start Up
The weld head / weld pincers may only be mounted and used on a vibration-free
base.
Caution
Self installation:
See chap. 4.2 for sizes of the drill holes for installation in automated devices.
4.1
Electrical Connections
Electrical connections must be done by a qualified electrician.
The stand and motor head should be grounded by the customer at the position indicated
for this purpose.
Caution
Connect the initiators etc.
Connect the power control of the AWS3 system with the motor control.
Connect the motor head.
Connect operation panel BT-AWS3.
Connect the units to mains.
4.1.1
Mains Connection
Observe mains voltage!
First compare the existing supply voltage to the voltage stated on the type label of the
equipment
.
Warning
Valid regulations must be heeded for fusing and grounding and for the dimensioning of
the mains line.
The unit is supplied with a rubber connector.
The mains cable may need to be replaced to conform to differing requirements in
different countries.
Please contact our Service Department for information.