APPENDIX A: TECHNICAL SPECIFICATIONS
MODEL 250DP DUAL PULSE
RESISTANCE WELDING POWER SUPPLY
A-12
990-280
Initiation Switch
Manual Head Operation
If the 250DP is connected to a manual head, the initiation switch is the force firing switch located in the
weld head.
Air Head Operation
If the 250DP is connected to an air actuated head, the initiation switch is the footswitch. The first level
of a 2-level footswitch instructs the 250DP to:
x
Switch the valve driver to ON, which causes the upper electrode of the weld head to apply force, as
determined by the air regulator connected to the top of the air cylinder on the weld head, to the
workpiece.
x
Start the squeeze period.
The 2nd Level initiates the start of the Weld Period, provided that the Force Firing Switch has closed
and
the Squeeze Period has ended. A 1-Level Footswitch combines the functions of both levels of a 2-
Level Footswitch.
Chain Schedules Feature
The chain schedules feature is used to automatically change the weld schedule in use to another specified
schedule. Chain schedules is a system feature, and is turned ON using the options menu.
When chain schedules is turned ON, the RUN screen and PROGRAM screen for each schedule will have
additional fields for both STEP COUNT and NEXT SCHEDULE. STEP COUNT and NEXT SCHEDULE
are used to chain schedules together.
Step Count
STEP COUNT is a weld counter which counts down to 0. Any number from 00001 to 99999 can be
entered as a step count. When the step count reaches 0, the schedule will change as specified by the
NEXT SCHEDULE. If a weld sequence is not completed and/or the WELD/NO WELD switch is set to
NO WELD, the step counter will
not
count down.