IPB-5000A
7. Basic Operation
7-3
(10) Set ON (Closed circuit) to 2ND STAGE
Start Input to begin testing the weld.
The squeeze signal is output, and
then the weld head begins to
squeeze for the weld.
As the figure on the right is displayed,
check that the weld schedule is
correctly set.
When confirming the operation, check that
SQZ time
(S
queeze
Time
)
is sufficient.
If weld current flows before the welding electrode force becomes
sufficient, spatters are produced.
WARNING
!