8
bricks wall, ensure to fill it with concrete cement completely, and
use anchor fastener bolt in case of the hebel wall.
After selecting a proper location, install the mounting bracket to a
solid wall.
The methods of installation: On the wall that is strong enough, drill 2
holes with a diameter of 8 mm, and the distance between one hole
to another is 62 mm. The depth of the hole is approximately 45
mm. Use the anchor fastener bolts that are provided along with the
product for securing the bracket (Picture 6) firmly on the wall.
Align the slots on the back of the water heater with the projections
on the bracket and mount the water heater on the bracket until it is
locked.
Install the power plug to the supply socket in the wall. The suitable
power supply is 220V. It is recommended to place the supply
socket on the right above the water heater. The height of the
power socket to the ground should not be less than 1.8 m (see
Picture 7). If there is a problem on the power cord, the cord should
be replaced by
MODENA
agencies, or qualified person to ensure
the safety.
Picture 6
Picture 7
E (Yellow/Green)
L (Brown)
N (Blue)
Ground
≥1.8 m