6
5.
The exhaust hood has two holes on it: Hole
D
and Hole
E
(look
at the picture). To install the spigot/flange and hole cover, follow
these instructions:
•
For ducting / exhaust system
:
Install the spigot / flange G on one of the air holes, either D
or E. Holes which do not have spigot / flange shall be
covered with Hole Cover H.
•
For re-circulating system
:
Both air holes D and E shall be covered with the available
plastic Hole Cover
INSTALATION OF EXHAUST HOOD
Exhaust hood can be installed on the concrete (brick) wall or the bottom part of the kitchen set.
Installing on concrete (brick) wall
1.
Draw a centerline on the wall where the exhaust hood is to be
installed (1).
2.
Post a template for drilling on the wall (2). If no template is
available, attach the exhaust hood on the wall and mark the spot
on the wall where a hole is to be made.
3.
Create holes on the four marks with a 6 mm diameter drill bit or
fisher size (3), and then insert the fisher to the four holes (4).
Attention:
Before drilling, make sure that there's no cable installation, water pipe and installation inside the wall.
4.
Install the screw on both upper holes and set aside 1 cm between
the head of the screw and the wall surface (5).
5.
Install the exhaust hood on the screwed wall by suspending the
v e n t hood on the screw (6).
6.
When the exhaust hood is positioned correctly on the wall, tighten
both screws on the upper part (7).
7.
To reinforce the exhaust hood handle on the wall, install the screws
on both holes on the bottom part (8) and tighten them (9).
8.
Reassembling the aluminum filter.
9.
Connect the exhaust system with the spigot / flange if the exhaust
hood is to be operated as a ducting / exhaust system