customerservice@modernflames.com
modernflames.com
Installation and Assembly
...then screw into side wall until flush with inner box frame.
Repeat on all four (4) framing boxes.
Raise wall. From the bottom of unit, remove & reuse
previous screws, see step 5, and add second secure screws
sixteen (16), making sure to keep wall flush with
side wall upright.
1
2
3
4
Locate center of main unit and align with
previously marked center.
Once all sure wall is level, and begin
to secure four (4) wall screws to wall,
must attach to two (2) studs in wall.
Continue process securing all four (4) framing
boxes to the wall.
Approximate position for screws shown,
studs in wall will indicate exact position for
securing screws
Once all sixteen (16) wall screws are secured, and unit level,
then connect your power outlets. Run extension to
third framing box if installing a television.
7
8
9
10
11
12