Recessed Installation:
1. Prepare frame opening according to chart.
Frame opening is slightly larger than the fire
unit.
2. Fold out the small tabs on the side of the
fire unit.
3. Secure fire unit to the finished framed
opening with the provided large washer head
screws. Make certain that at least 4 of the
screws are driven in to a solid backing.
Fireplace will stand proud of the finished wall
opening by 10mm. This is a semi-permanent
installation. Remove screws to relocate.
4. Connect the fire feature to the inside of the
fire unit.
5. Hang the glass face on the fire unit. Make
certain that the hooks from the on the
backside of the glass face are secured in all 4
slots on the fire unit.
6. Install the grid in to the glass face.
Power
cord
Power
cord
Power
cord
HF900CBI
838mm W x 692mm H x
305mm D
HF1200CBI
991mm W x 692mm H x
305mm D
HF1500CBI
1448mm W x 692mm H x
305mm D
Summary of Contents for HF1200CBI
Page 14: ...14 MAINTENANCE NOTES ...
Page 15: ...15 MAINTENANCE NOTES ...
Page 16: ...16 2012 www modernflames com Please dispose of properly ...