6
INSTALLATION
INSTALLATION
1. Prepare the framed opening according to
the chart above. Provide a flexible 10 amp
220-240 volt circuit for hard wire installation.
2. Install L Metal Nailing Flanges.
3. Connect hard wire to the terminal block
according to the diagram below. Choose
any connector type according to local
building code.
Terminal block
Model
H
W
D
LFV100015-SH 585mm
1416mm 305mm
LFV150015-SH 585mm
1924mm 305mm
LFV200015-SH 585mm
2432mm 305mm
LFV250015-SH 585mm
2940mm 305mm
LFV300015-SH 585mm
3448mm 305mm
W
H
D
To be performed by a qualified
electrician according to local building
codes.