6
INSTALLATION
1. Prepare the framed opening according to
the chart above. Provide a flexible 15 amp
120 volt circuit for hard wire installation.
2. Install L Metal Nailing Flanges.
3. Connect hard wire to the terminal block
according to the diagram below. Choose
any connector type according to local
building code.
Terminal block
Model
H
W
D
LFV2-40/15-SH
23”
55 3/4”
12”
LFV2-60/15-SH
23”
75 3/4”
12”
LFV2-80/15-SH
23”
95 3/4”
12”
LFV2-100/15-SH
23”
115 3/4”
12”
LFV2-120/15-SH
23”
135 3/4”
12”
W
H
D
To be performed by a qualified
electrician according to local building
codes.