7
INSTALLATION
Framing Dimensions
Model
W
H
D
SPM-3026
30 ¹
⁄
”
35 ³
⁄
”
13”
SPM-3626
36 ¹
⁄
”
35 ³
⁄
”
13”
SPM-4226
42 ¹
⁄
”
35 ³
⁄
”
13”
SPM-5426
54 ¹
⁄
”
35 ³
⁄
”
13”
1. Prepare the framed opening according to the
chart above. *Provide appropriate dedicated
circuit for hardwire install at the top right of
framed opening.
2. Install L Metal Nailing Flanges to the top and
bottom of the
fi
re unit.
3. Install the
fi
re unit in the framed opening with a
minimum 1 ¼ drywall screws to secure the unit.
4. Mask the exposed
fi
re unit during the
drywall process.
Install drywall to the drywall
stops on the perimeter of the
fi
re box. For
more information on the drywall stops see the
Product Guide on page 4.
5. Decorate according to media installation guide
on page 10.
6. Install the side and front glass pieces according
to installation diagram on Page 11.
3 Sided Installation (Bay)