9
INSTALLATION
Partial Recess Installation
1. This installation is optimized for a 2x6 framed
wall. Prepare the framed opening according
to the height and width of the chart on page
7. *Provide appropriate dedicated circuit for
hardwire install at the top right of framed
opening.
2. Install L Metal Nailing Flanges to the top and
bottom of the
fi
re unit.
3. Install the
fi
re unit in the framed opening with a
minimum 1 ¼ drywall screws to secure the unit.
4. Firebox must be covered with material of
choice. Mask the exposed
fi
re unit during
this process.
Install drywall, tile or material
of your choice to the drywall stops on the
perimeter of the
fi
re box. For more information
on the drywall stops see the Product Guide on
page 4.
5. Decorate according to media installation guide
on page 10.
6. Install the side and front glass pieces according
to installation diagram on Page 11.