ACTIVITY NAME:

Summary Install Guide
1. Dig and pour main footing; Dig holes for strut footings but do not pour
2. let concrete set for minimum 72 hours
3. Erect large pole and bolt to footing
4. Bolt Struts onto main pole and bolt strut footing on. pour the strut footings
5. Allow concrete to set for minimum 72 hours
6. Bolt swing hanger to main pole and assemble chains and seat. ensure seat
has a minimum 500mm clearance from finished soft-fall level. You may have to
shorten chains to achieve this.