Before installation or adjusting this product,
please read these instructions carefully.
Please keep this guide for future reference
TITLE:
CoreSync Gateway 90W UPOE
ENGINEERING RECORD NO : 642341
Doc No: 1807981000
REV-A
CREATED/REVISED BY:
Ruben Chairez JR
CHECKED BY:
Anthony Mackey
APPROVED BY:
Giovanni Frezza
DATE:
2022/Feb/10
MPN/FMT-041 (2019/FEB/19 REV-01). SHEET No.
2
of
3
INSTALLATION INSTRUCTIONS
4. PROCEDURES:
STEP 1.
Refer to the mounting pattern below to mount the 90W Gateway.
STEP 2.
Snap in the wire harness male connector into the female connector as shown below to connect the CoreSync
Bus as shown below. The CoreSync Bus harness must be comprised of at least 20 AWG wire.
STEP 3.
Use #8 self-tapping screws to mount the 90W Gateway as shown below (Screws not provided). It is
recommended that the Gateway is not connected to earth ground.