background image

I 7082

LISTE DES PIÈCES DE MONTAGE

HARDWARE LIST

F

METAL DRAWER SLIDE -

 17 3/4"

1

G

METAL DRAWER SLIDE -

 15 3/4"

2

H

ASSEMBLING SCREW -

 1/2"

42

I

ASSEMBLING SCREW -

 1 3/8"

12

J

HANDLE -

 4 3/4"

3

PIÈCE / PART #

IMAGE

DESCRIPTION

QTY / QTÉ

PAGE  8  DE / OF  20

COULISSE DE MÉTAL -

 15 3/4"

COULISSE DE MÉTAL -

 17 3/4"

VIS D'ASSEMBLAGE -

 1/2"

VIS D'ASSEMBLAGE -

 1 3/8"

POIGNÉE -

 4 3/4"

Summary of Contents for I 7082

Page 1: ...I 7082 BUREAU 60 L METAL ARGENT TAUPE FONCE COMPUTER DESK 60 L DARK TAUPE SILVER METAL ...

Page 2: ...ACING RIGHT SIDE PANEL 1 3 FRONT FACING LEFT SIDE PANEL 1 4 FRONT FACING RIGHT SIDE PANEL 1 5 BOTTOM PANEL 2 PIÈCE PART IMAGE DESCRIPTION QTY QTÉ PAGE 2 DE OF 20 PANNEAU DE CÔTÉ GAUCHE PANNEAU DE CÔTÉ AVANT DROIT PANNEAU DE CÔTÉ GAUCHE PANNEAU DE CÔTÉ AVANT DROIT PANNEAU DU BAS ...

Page 3: ...S LIST 6 TOP PANEL 2 7 BACK PANEL 2 8 BACK PANEL 1 9 DESK TOP 1 10 DRAWER FRONT PANEL 2 PIÈCE PART IMAGE DESCRIPTION QTY QTÉ PAGE 3 DE OF 20 PANNEAU DE SURFACE PANNEAU ARRIÈRE PANNEAU ARRIÈRE SURFACE DU BUREAU PANNEAU AVANT TIROIR ...

Page 4: ...12 DRAWER SIDE PANEL 2 13 DRAWER SIDE PANEL 2 14 DRAWER BOTTOM PANEL 2 15 DRAWER FRONT PANEL 1 PIÈCE PART IMAGE DESCRIPTION QTY QTÉ PAGE 4 DE OF 20 PANNEAU ARRIÈRE TIROIR PANNEAU DE CÔTÉ TIROIR PANNEAU DE CÔTÉ TIROIR PANNEAU DU BAS TIROIR PANNEAU AVANT TIROIR ...

Page 5: ...NEL 1 17 DRAWER SIDE PANEL 1 18 DRAWER SIDE PANEL 1 19 DRAWER BOTTOM PANEL 1 20 CROSSBAR 2 PIÈCE PART IMAGE DESCRIPTION QTY QTÉ PAGE 5 DE OF 20 PANNEAU ARRIÈRE TIROIR PANNEAU DE CÔTÉ TIROIR PANNEAU DE CÔTÉ TIROIR PANNEAU DU BAS TIROIR BARRE TRANSVERSALE ...

Page 6: ...I 7082 LISTE DES PIÈCES PARTS LIST 21 METAL LEG 2 PIÈCE PART IMAGE DESCRIPTION QTY QTÉ PAGE 6 DE OF 20 PATTE EN METAL ...

Page 7: ... DOWEL Ø3 8 X 1 1 8 32 C CAM LOCK SCREW 1 3 8 18 D CAM LOCK CONNECTOR Ø5 8 X 1 2 18 E ASSEMBLING SCREW 1 5 8 12 PIÈCE PART IMAGE DESCRIPTION QTY QTÉ PAGE 7 DE OF 20 GOUJON DE BOIS Ø3 8 X 1 1 8 COLLE 40G VIS CAM LOCK 1 3 8 ÉCROU CAM LOCK Ø5 8 X 1 2 VIS D ASSEMBLAGE 1 5 8 ...

Page 8: ... 17 3 4 1 G METAL DRAWER SLIDE 15 3 4 2 H ASSEMBLING SCREW 1 2 42 I ASSEMBLING SCREW 1 3 8 12 J HANDLE 4 3 4 3 PIÈCE PART IMAGE DESCRIPTION QTY QTÉ PAGE 8 DE OF 20 COULISSE DE MÉTAL 15 3 4 COULISSE DE MÉTAL 17 3 4 VIS D ASSEMBLAGE 1 2 VIS D ASSEMBLAGE 1 3 8 POIGNÉE 4 3 4 ...

Page 9: ...ASSEMBLING BOLT 1 3 8 6 M ASSEMBLING BOLT 1 1 8 4 N ASSEMBLING BOLT 5 8 4 O ASSEMBLING SCREW 1 1 8 6 PIÈCE PART IMAGE DESCRIPTION QTY QTÉ PAGE 9 DE OF 20 BOULON D ASSEMBLAGE 1 3 8 BOULON D ASSEMBLAGE 1 1 8 BOULON D ASSEMBLAGE 1 1 8 BOULON D ASSEMBLAGE 5 8 VIS D ASSEMBLAGE 1 1 8 ...

Page 10: ...HANGING FOLDER BAR 14 1 4 2 R FINISHING STICKER Ø3 4 18 S SUPPORT 3 1 8 4 T METAL BRACKET 11 7 8 2 PIÈCE PART IMAGE DESCRIPTION QTY QTÉ PAGE 10 DE OF 20 BARRE DE DOSSIER SUSPENDUE 14 1 4 CLÉ HEXAGONALE COLLANT DE FINITION Ø3 4 SUPPORT 3 1 8 SUPPORT DE MÉTAL 11 7 8 ...

Page 11: ...I 7082 LISTE DES PIÈCES DE MONTAGE HARDWARE LIST U FLOOR PROTECTOR 1 1 2 X 3 4 4 PIÈCE PART IMAGE DESCRIPTION QTY QTÉ PAGE 11 DE OF 20 PROTECTEUR DE PLANCHER 1 1 2 X 3 4 ...

Page 12: ...I 7082 PAGE 12 DE OF 20 ...

Page 13: ...I 7082 ÉTAPE STEP 1 ÉTAPE STEP 2 PAGE 13 DE OF 20 ...

Page 14: ...I 7082 ÉTAPE STEP 3 ÉTAPE STEP 4 PAGE 14 DE OF 20 ...

Page 15: ...I 7082 ÉTAPE STEP 5 ÉTAPE STEP 6 PAGE 15 DE OF 20 ...

Page 16: ...I 7082 ÉTAPE STEP 7 ÉTAPE STEP 8 PAGE 16 DE OF 20 ...

Page 17: ...I 7082 ÉTAPE STEP 9 ÉTAPE STEP 10 PAGE 17 DE OF 20 ...

Page 18: ...I 7082 ÉTAPE STEP 11 ÉTAPE STEP 12 PAGE 18 DE OF 20 ...

Page 19: ...I 7082 ÉTAPE STEP 13 ÉTAPE STEP 14 PAGE 19 DE OF 20 ...

Page 20: ...I 7082 ÉTAPE STEP 15 PAGE 20 DE OF 20 ...

Reviews: