20
AS 914 TI
User Manual
3. UnPACKInG/ASSeMblY
Take the utmost care when unpacking, assembling, hoisting and installing the ma-
chine as described below.
Failure to observe these instructions can damage the machine and compromise the
operator’s safety.
WARNING
Before removing the machine from the pallet, make shure the items showed below have
been removed from the pallet.
NOTICE
- Remove the upper part of
the packing and make sure
that the machine has not
suffered damage in transit;
identify the points at which
the machine is anchored to
the pallet.
- The machine comprises 2
main units (fig.1d):
A body
B column with internal
tank and mounting head
arm
- After removing the column
B, it is advisable to place
it in a horizontal position
to prevent it from falling
and getting damaged.
Assemble the different
parts of the machine:
- Lift tower “B”, locate it on
cabinet “A”, and secure it with the screws and nuts provided as per Fig. 2.
- Remove the screw “C” securing the knob “D” and vertical slide “G” (Fig.3); pull the
vertical slide downward from the swing arm “F”, remove spring “E” from the vertical
slide, re-insert (the same way round) vertical slide “G” in swing arm and insert spring
“E” (Fig.3); reassemble the knob and the screw (Fig.3).
- Mount the enclosure with pressure gauge “H” to the tower (Fig.3), and secure it.
1d
A