56D2161
7
B
A
H
A
E
C
D
F
G
1
/
2
" or
5
/
8
"
1
/
2
" or
5
/
8
"
C
A
G
C
G
A
1
/
2
" or
5
/
8
"
PRE-INSTALLATION INFORMATION
FIREPLACE FRAMING
Firebox framing can be built before or after the appliance is set in place. Construct firebox framing following
Figure 2
and
the chart below for your specific installation requirements.
See Figure 3 on Page 8
for firebox dimensions. The framing
headers may rest on the top of the firebox standoffs.
The firebox may be installed directly on a combustible floor or raised on a platform of an appropriate height. When the
firebox is installed directly on carpeting, tile, or other combustible material, other than wood flooring, the firebox shall be
installed on a metal or wood panel extending the full width and depth of the enclosure.
Corner Installation
Stud Location
Inside Chase Installation
Recessed Installation
Figure 2 - Framing Dimensions
WARNING
Do not fill spaces around firebox with
insulation or other materials. This
could cause a fire.
SDV500
SDV600
A
42
1
/
16
"
48
1
/
16
"
B
46
1
/
2
"
46
1
/
2
"
C
32
3
/
4
"
38
3
/
4
"
D
16
3
/
8
"
19
3
/
8
"
E
73
1
/
2
"
79
1
/
2
"
F
36
3
/
4
"
39
3
/
4
"
G
20
3
/
8
"
20
3
/
8
"
H
52"
56
1
/
4
"